groundranger
Historic · latest filing May 2025Residential

1133 N Madison Ave

Dallas, TX 75208

1133 N Madison Ave: 3 projects on record

City of Dallas lists 3 filings across 3 projects at 1133 N Madison Ave, Dallas, TX 75208 since May 11, 2025. The most recent, filed May 26, 2025, covers: “Replace existing hvac system, equipment and air ducts”.

Compiled from City of Dallas records · updated May 26, 2025

Projects
3
3 filings
Latest filing
May 26, 2025
since May 11, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Replace existing hvac system, equipment and air ducts

    Replace existing hvac system, equipment and air ducts

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-25-000320
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Total rewire

    Total rewire

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-000045
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replace water service and remodel plumbing

    Replace water service and remodel plumbing

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-000122
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 1133 N Madison Ave

What is being built at 1133 N Madison Ave?

The latest filing (City of Dallas permit RES-MEC-25-000320, May 26, 2025) covers replace existing hvac system, equipment and air ducts.

How many permits and filings does 1133 N Madison Ave have?

3 filings across 3 projects, from May 11, 2025 to May 26, 2025.

What is being built near Dallas Independence School District in Dallas?

1133 N Madison Ave is about 36 m from Dallas Independence School District (1144 N Madison Ave 1144 N Madison Ave). Its latest filing is for replace existing hvac system, equipment and air ducts.

Is there other construction near 1133 N Madison Ave?

Yes. Nearby filings include 1144 N Madison Ave (change out fixtures and change out pipping on roof, Jun 9, 2026); 1144 N Madison Ave 1144 N Madison Ave (james hogg ntc renovation and addition — additions to existing building — renovation scope includes providing new way-finding site signage, directional signage (entrance & exit), new marquee sign and provide new room graphic and way-finding signage. addition scope of work includes replacing the three rusted and hazardous p, Jan 26, 2024); 1144 N Madison Ave (hogg elementary renovation — renovation/alteration — renovation of existing school. scope is limited to hvac upgrades, water and sanitary piping upgrades, lighting upgrades and updated wayfinding, Dec 10, 2025).

How do I get alerts for new permits at 1133 N Madison Ave?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75208
Get alerts for 1133 N Madison Ave