1144 N Madison Ave
Dallas, TX 75231 · Dallas Indepedent School District
Hogg Elementary renovation planned at 1144 N Madison Ave
A renovation of the existing Hogg Elementary school is registered for 1144 N Madison Ave in Dallas. The TDLR project registration was filed on December 10, 2025, and lists HVAC, water and sanitary piping, lighting, and wayfinding upgrades. The project covers 32,000 square feet, with an applicant-estimated cost of $3 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- 32,000 sf
- Estimated cost
- $3.0M
- state registration
Where this project stands
Under constructionHogg Elementary Renovation
32,000 sq ft · $3.0M est.
- RegisteredDec 10, 2025
- Plan review
- ConstructionJun '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of existing school. scope is limited to hvac upgrades, water and sanitary piping upgrades, lighting upgrades and updated wayfinding. — hogg new tech elementary
TDLR project registrationRenovation/AlterationReview Complete32,000 sq ft$3.0M est.- Project #
- TABS2026007686
- Tenant / owner
- Hogg Elementary Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1144 N Madison Ave
What is being built at 1144 N Madison Ave?
The existing Hogg Elementary school is planned for renovation, not replacement. The registered work includes HVAC, water and sanitary piping, lighting, and wayfinding upgrades.
When was the Hogg Elementary renovation registered?
The TDLR project registration was filed on December 10, 2025. Its registration number is TABS2026007686.
What upgrades are planned at Hogg Elementary?
The registration lists HVAC upgrades, water and sanitary piping upgrades, lighting upgrades, and updated wayfinding.
How large is the Hogg Elementary renovation?
The TDLR registration lists a project area of 32,000 square feet.
How much will the Hogg Elementary renovation cost?
The applicant estimates the project cost at $3 million. This is an estimate listed in the TDLR registration, not a confirmed final cost.
Has the Hogg Elementary renovation been approved?
The TDLR project registration lists its status as “Review Complete.” The record does not provide a construction start date.
Also being built nearby
All of 75231- 1144 N Madison AveJun 9, 2026Change out fixtures and change out pipping on roof
- 1144 N Madison Ave 1144 N Madison Ave · Dallas Independence School DistrictJan 26, 2024James hogg ntc renovation and addition — additions to existing building — renovation scope includes providing new way-finding site signage, directional signage (entrance & exit), new marquee sign and provide new room graphic and way-finding signage. addition scope of work includes replacing the three rusted and hazardous p
- 1133 N Madison AveMay 26, 2025Replace existing hvac system, equipment and air ducts · 36 m away
- 1163 N Madison AveDec 12, 2025Gas tst · 51 m away
- 1111 N Madison AveNov 9, 2026Multifamily - associated with permit #com-ph-new-26-000063, unit 4 · 95 m away
- 1114 Elsbeth AveNov 11, 2026Relocate gas meter · 112 m away
- 1101 N Madison AveSep 24, 2026Bu zo me pl el commercial alteration addition. garage conversion to single family dwelling for 5th unit apartment e · 122 m away
- 126 Neches StFeb 18, 2026Water heater replacement (gas) · 123 m away
- 1150 N Bishop AveSep 16, 2025Install a rpz on 3" mainline feeding potable water · 140 m away
- 1130 N Bishop AveAug 27, 2026Hvac change out – remove & replace 1 full system. no new duct work. attic installation · 143 m away
- 1128 Ballard AveMar 4, 2026Gas yard service · 158 m away
- 1215 N Bishop AveDec 9, 2025Install 11 steel hybrid piers · 158 m away