122 Melba St
Dallas, TX 75208
122 Melba St: 1 project on record
City of Dallas lists 1 filing across 1 project at 122 Melba St, Dallas, TX 75208. The most recent, filed October 14, 2020, covers: “Install roof mounted solar panels”.
Compiled from City of Dallas records · updated Oct 14, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2020
- since Oct 14, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 122 Melba St
What is being built at 122 Melba St?
The latest filing (City of Dallas permit 2010121039, October 14, 2020) covers install roof mounted solar panels.
How many permits and filings does 122 Melba St have?
1 filing across 1 project, from October 14, 2020 to October 14, 2020.
Is there other construction near 122 Melba St?
Yes. Nearby filings include 111 Melba St (complete demolition of existing single-family residence (wood frame, 1,618 sq ft) and all associated site improvements at 111 melba street, dallas, tx. all utilities to be disconnected and capped prior to demolition. all debris and foundations to be fully removed from site.demolition is required to clear the site for arthouse apartments, a 70-unit multifamily development with structured parking. engineering (dp23-316) and water/wastewater (ww 22-828) plans are stamped and approved. active permitting under record 2401021045_186953420-001.this permit is filed in conjunction with companion demolition permit com-dem-26-000051 (adjacent property, same owner, same project). no structures or improvements to remain upon completion, May 1, 2026); 305 N Beckley Ave (complete demolition of existing single-story commercial auto repair structure (safety brake services) at 305 n beckley ave, dallas tx 75203 to grade. site to be cleared for new 7-story multifamily residential development (art house apartments), Apr 21, 2026); 129 W 9th St (atmos did not want to reinstate gas until a full gas test was done. gas test has been placed on meter. a water heater will also be replaced, Aug 21, 2026).
How do I get alerts for new permits at 122 Melba St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 111 Melba StMay 1, 2026Complete demolition of existing single-family residence (wood frame, 1,618 sq ft) and all associated site improvements at 111 melba street, dallas, tx. all utilities to be disconnected and capped prior to demolition. all debris and foundations to be fully removed from site.demolition is required to clear the site for arthouse apartments, a 70-unit multifamily development with structured parking. engineering (dp23-316) and water/wastewater (ww 22-828) plans are stamped and approved. active permitting under record 2401021045_186953420-001.this permit is filed in conjunction with companion demolition permit com-dem-26-000051 (adjacent property, same owner, same project). no structures or improvements to remain upon completion · 22 m away
- 305 N Beckley AveApr 21, 2026Complete demolition of existing single-story commercial auto repair structure (safety brake services) at 305 n beckley ave, dallas tx 75203 to grade. site to be cleared for new 7-story multifamily residential development (art house apartments) · 37 m away
- 129 W 9th StAug 21, 2026Atmos did not want to reinstate gas until a full gas test was done. gas test has been placed on meter. a water heater will also be replaced · 82 m away
- 103 W 9th StOct 23, 2025Repair roofing because of an tree that fell on the alley · 89 m away
- 112 W 8th StOct 5, 2026Zo bc residential duplex unit conversion to mixed use, one side to remain its current residential use and the other to be converted to retail, specifically to a tortilleria under general merchandise and food store >2,500sqft use. since this is a >700 sq ft it's considered as a b-occupancy and no major inspections triggered as per city staff observations. no major structural changes will be made to the property, only esthetical remodelation and addition of a new electrical installation to support commercial equipment loads, and plumbing for sinks and grease traps · 96 m away
- 125 W 8th StJul 28, 2026Re-roof · 107 m away
- 119 W 8th StOct 20, 2026Wire new four unit building · 107 m away
- 117 W 8th StOct 20, 2026Wire new four unit buiding · 108 m away
- 115 W 8th StSep 23, 2026Plumbing for 4 units associated with permit #com-new-26-000200 · 108 m away
- 111 W 8th StSep 23, 2026Plumbing for 4 units associated with permit #com-new-26-000199 · 109 m away
- 411 N Beckley AveNov 6, 2020Demolition sfd · 121 m away
- 201 E 9th StJun 16, 2025Repair electrical servicepremise # 2593344 · 122 m away
More solar installs in 75208.