129 W 9th St
Dallas, TX 75208
Gas testing, water-heater replacement and electrical repairs
Dallas permits at 129 W 9th St cover electrical service repairs and gas testing, with a water heater also set to be replaced; the records do not indicate a new building. The electrical permit was filed July 16, 2026, and the plumbing permit was filed August 21, 2026.
Summarized from City of Dallas records · updated Aug 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 21, 2026
- since Jul 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsAtmos did not want to reinstate gas until a full gas test was done. gas test has been placed on meter. a water heater will also be replaced
Atmos did not want to reinstate gas until a full gas test was done. gas test has been placed on meter. a water heater will also be replaced
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 129 W 9th St
What is being built at 129 W 9th St in Dallas?
The available permits describe repairs, not new construction: electrical service repairs and gas testing, plus replacement of a water heater.
What work is permitted at 129 W 9th St?
A July 16, 2026 commercial electrical permit covers service repairs due to vandalism. An August 21, 2026 commercial plumbing permit describes a gas test and water-heater replacement.
Is a new building going up at 129 W 9th St, Dallas?
The two City of Dallas permits in this record describe electrical and plumbing work. They do not indicate new building construction.
Why was gas testing required at 129 W 9th St?
The August 21, 2026 plumbing permit says Atmos did not want to reinstate gas until a full gas test was completed; it also notes that a water heater will be replaced.
What does permit COM-ELC-26-003074 cover?
The City of Dallas commercial electrical permit, filed July 16, 2026, covers electrical service repairs due to vandalism.
What does permit COM-PLM-26-003176 cover?
The City of Dallas commercial plumbing permit, filed August 21, 2026, notes gas testing and replacement of a water heater.
Also being built nearby
All of 75208- 103 W 9th StOct 23, 2025Repair roofing because of an tree that fell on the alley · 39 m away
- 122 Melba StOct 14, 2020Install roof mounted solar panels · 82 m away
- 111 Melba StMay 1, 2026Complete demolition of existing single-family residence (wood frame, 1,618 sq ft) and all associated site improvements at 111 melba street, dallas, tx. all utilities to be disconnected and capped prior to demolition. all debris and foundations to be fully removed from site.demolition is required to clear the site for arthouse apartments, a 70-unit multifamily development with structured parking. engineering (dp23-316) and water/wastewater (ww 22-828) plans are stamped and approved. active permitting under record 2401021045_186953420-001.this permit is filed in conjunction with companion demolition permit com-dem-26-000051 (adjacent property, same owner, same project). no structures or improvements to remain upon completion · 97 m away
- 305 N Beckley AveApr 21, 2026Complete demolition of existing single-story commercial auto repair structure (safety brake services) at 305 n beckley ave, dallas tx 75203 to grade. site to be cleared for new 7-story multifamily residential development (art house apartments) · 106 m away
- 201 E 9th StJun 16, 2025Repair electrical servicepremise # 2593344 · 141 m away
- 106 E 10th StJun 9, 20266,625 sq ft - sweep existing roof free of dirt and debris in preparation for a roof recover application. mechanically fasten one layer of 1-ply 115 mil fleeceback tpo membrane over the existing roof. *no structrual changes*building is occupied · 161 m away
- 206 Melba StNov 16, 2026Demolish and haul away house and foundation, adjacent shed structure, concrete stairs and associated flat work at adjacent empty lot · 163 m away
- 212 Melba StJan 20, 2021Tree removal requires separate permit · 171 m away
- 112 W 8th StOct 5, 2026Zo bc residential duplex unit conversion to mixed use, one side to remain its current residential use and the other to be converted to retail, specifically to a tortilleria under general merchandise and food store >2,500sqft use. since this is a >700 sq ft it's considered as a b-occupancy and no major inspections triggered as per city staff observations. no major structural changes will be made to the property, only esthetical remodelation and addition of a new electrical installation to support commercial equipment loads, and plumbing for sinks and grease traps · 177 m away
- 125 W 8th StJul 28, 2026Re-roof · 188 m away
- 119 W 8th StOct 20, 2026Wire new four unit building · 189 m away
- 117 W 8th StOct 20, 2026Wire new four unit buiding · 189 m away