1322 Kessler Pkwy
Dallas, TX 75208
Gas system test permitted at 1322 Kessler Pkwy
A residential plumbing permit for a gas system test at 1322 Kessler Pkwy was filed on November 17, 2025. The City of Dallas record does not specify any construction, project value, or permit status.
Summarized from City of Dallas records · updated Nov 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 17, 2025
- since Nov 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1322 Kessler Pkwy
What is happening at 1322 Kessler Pkwy?
A City of Dallas residential plumbing permit filed November 17, 2025, describes a test on the gas system.
Is a new home being built at 1322 Kessler Pkwy?
The permit record describes a gas system test, not new home construction.
When was the permit for 1322 Kessler Pkwy filed?
The City of Dallas filed the residential plumbing permit on November 17, 2025.
What does permit RES-PLM-25-007645 cover?
Permit RES-PLM-25-007645 covers a test on the gas system at 1322 Kessler Pkwy.
What's happening near Dallas Sylvan Thirty at 1322 Kessler Pkwy?
A residential plumbing permit for a gas system test was filed at 1322 Kessler Pkwy, about 332 meters from the listed Dallas Sylvan Thirty landmark.
How much will the work at 1322 Kessler Pkwy cost?
The City of Dallas record does not list a project cost or permit valuation.
Also being built nearby
All of 75208- 1624 Eastus DrNov 6, 2025Gas lie to grill and future fire pit · 186 m away
- 1614 Oak Knoll StDec 21, 2020Replace or modify existing hvac · 192 m away
- 1603 Oak Knoll StMay 7, 2025Install a tesla powerwall, tesla energy gateway & tesla remote meter. electrician shutdown needed to install tesla energy gateway-3 between the mdp and new span panel · 220 m away
- 1614 Eastus DrAug 18, 2026Nsfaa new single family residence to be constructed on existing demolished site · 228 m away
- 1622 Cedar Hill AveJun 1, 2026Run new gas service to new gas tankless water heater on left side of house. also install 2 more new gas tankless water heaters. one in closet and other in attic · 250 m away
- 1057 Kessler PkwyMar 10, 2026Install a new air conditioning and heating system · 286 m away
- 1031 Kessler PkwyNov 9, 2026Installed 2 new systems and ductwork · 310 m away
- 1661 Sylvan AveNov 9, 2025Replace water heater · 313 m away
- 1567 Oak Knoll StOct 9, 2026Hvac system replacement/install · 321 m away
- 1805 Sylvan AveJun 17, 2026Installation of new electrical service and electrical vehicle supply equipment (evse) for a total of (4) electrical vehicle charging stalls in parking area, anticipated work as follows: - install (2) electric vehicle charging stations- install service electric al distribution equipment- install utility customer equipment for new electrical service- install concrete foundations and pads for support equipment -install screening if required by zoning requirements · 329 m away
- 1808 Sylvan Ave · Ch Retail Fund II/Dallas Sylvan Thirty, L.p.Apr 30, 2026New hvac 10 ton-12ton · 332 m away
- 750 Fort Worth AveMar 5, 2026Mcr parking garage concrete/grading repairs-remove the slab area from the retaining wall to the first crack control line, which is approximately 16 feet from the wall.-recompact the subgrade as necessary. provide additional subgrade fill and recompact as needed.-provide #3 (3/8") smooth dowels @ 12" on center into the top of wall concrete and into the existing slab-on-grade. drill and epoxy the dowels using hilti hy200 epoxy (or equivalent). embed dowels 4" into the existing concrete. place dowels 3" from top of wall concrete and slab-on-grade.-pour back a 5" think slab-on-grade (compressive strength t-c=3000 psi minimum), reinforce with #3 bars @ 12" on center each way. thicken the slab to 10 inches deep by 12 inches wide along the retaining wall · 337 m away