Recent · latest filing Mar 2026Residential
1611 Taft St
Dallas, TX 75208
Double cleanout installation permitted at 1611 Taft St
A residential plumbing permit for a double cleanout installation at 1611 Taft St was filed on March 26, 2026. The City of Dallas record lists permit RES-PLM-26-003265.
Summarized from City of Dallas records · updated Mar 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 26, 2026
- since Mar 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1611 Taft St
What is being built at 1611 Taft St in Dallas?
A City of Dallas residential plumbing permit describes a double cleanout installation at the address.
When was the plumbing work at 1611 Taft St permitted?
The permit was filed on March 26, 2026.
What is the permit number for 1611 Taft St?
The permit number is RES-PLM-26-003265.
Is this a residential or commercial project at 1611 Taft St?
The City of Dallas record classifies it as a residential plumbing permit.
What is being done near Dallas Independent School District at 719 N. Montclair Ave?
A double cleanout installation was permitted at 1611 Taft St, about 140 meters from the Dallas Independent School District address listed in the record.
Also being built nearby
All of 75208- 1623 Taft StSep 22, 2020Permanent electrical service · 18 m away
- 1631 Taft StMar 25, 2026Complete system · 31 m away
- 806 N Montclair AveSep 30, 2026Remodel3 full bath, 1 kitchen, wash room · 36 m away
- 829 N Montclair AveApr 20, 2026Replacing gate · 36 m away
- 831 N Montclair AveJan 27, 2021Addition to sfd · 38 m away
- 811 N Windomere AveApr 27, 2026Replace 4 ton gas ac · 126 m away
- 1621 Kyle StJul 18, 2025Hvac replacement · 128 m away
- 800 N Windomere AveApr 23, 2026Locked meter · 138 m away
- 802 N Windomere AveJun 17, 2026Nsfaa expanding outside porch on property. adding wood decking over exiting porch · 138 m away
- 818 N Windomere AveDec 15, 2025Installing 5 total pilings (5 breakouts) · 140 m away
- 719 N. Montclair Ave · Dallas Independent School DistrictFeb 15, 2024Rosemont es phase 2 — additions to existing building — 6 classroom addition and restrooms to an existing 3-8th grade campus. approximately 8,400 sq ft · 140 m away
- 903 N Montclair AveJul 22, 202512 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate · 140 m away