Clean-and-show permit filed at 210 W 10th St
A City of Dallas commercial electrical permit filed June 24, 2026, describes a “clean and show” at 210 W 10th St. The permit description says no electrical work is needed and does not specify a new building or future use.
Summarized from City of Dallas records · updated Jun 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 24, 2026
- since Jun 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 210 W 10th St
What is being built at 210 W 10th St in Dallas?
The June 24, 2026, permit describes a clean-and-show, not new construction. It says no electrical work is needed.
What does the permit for 210 W 10th St say?
City of Dallas permit COM-ELC-26-002698 describes the work as a “clean and show” and says no electrical work is needed.
When was the permit filed for 210 W 10th St?
The City of Dallas permit was filed June 24, 2026.
Is electrical work planned at 210 W 10th St?
The permit description says no electrical work is needed.
What will the space at 210 W 10th St be used for?
The permit does not identify a future use or tenant. It only describes a clean-and-show.
Is a new building planned at 210 W 10th St?
The available permit record does not describe a new building. It refers to a clean-and-show and says no electrical work is needed.
Also being built nearby
All of 75208- 105 S Zang BlvdJun 24, 2026No electrical work needed. this is for a clean and show · 17 m away
- 103 N Adams AveSep 6, 2022Multifamily new construction 103 n adams · 93 m away
- 210 Sunset AveOct 26, 2020Install electrical for new contruction or addition · 103 m away
- 224 Sunset AveAug 19, 2026The building was apparently previously altered. i have not made any alterations. it was restored to a white empty building. a door was added to one room. i applied for my co-26-003745 and applied at the beginning of june. i have paid and now am being told an alteration addition is need two months later. the building has been painted and restored to its original condition as advertised to me by contractors of the owner. the building is empty with no furniture. requesting this be reviewed as soon as possible so that i can get my co approved · 105 m away
- 205 Sunset AveJan 2, 2026Remodeling and adding less than 10 feet of duct work · 105 m away
- 120 N Madison AveJun 8, 2026Qteam rebuild of unit #2113first floor - building cdemo and haul away debris - $4000.00re framing 2x4 wall, insulating wall with batting strips r-30 - $4000.00installing new osb wood to wall - $1500.00installing new synthetic wrap - $400.00installing new brick and mortar to wall - $3500.00installing new vinyl double pane single hung window - $1000.00electrical work - re wiring electrical plugs adding junction boxes to wall - $750.00installing new sheetrock, tape, bed, retexture to walls and ceiling - $3500.00installing new (2) window stools and trim boards - $350.00installing new base moldings - $250.00primer coat / painting walls, ceiling, trim, and doors - $1500.00includes engineers report - $5000.00 · 149 m away
- 323 W 10th StJul 2, 2025Main panel box, main breaker replace only, we need an emergency inspection. cuz on this building lives a many families and changing this breaker are affecting now and we need reconnect the power really soon · 193 m away
- 315 Sunset AveNov 9, 2026This location was recently review. owner change scope and want to demolition building, foundation and parking. demolition all · 199 m away
- 106 E 10th StJun 9, 20266,625 sq ft - sweep existing roof free of dirt and debris in preparation for a roof recover application. mechanically fasten one layer of 1-ply 115 mil fleeceback tpo membrane over the existing roof. *no structrual changes*building is occupied · 200 m away
- 207 W Jefferson BlvdDec 14, 2025Qteam qr interior commercial office finish-out.construction of new non-load bearing wood-framed interior walls. no structural modifications. no electrical, mechanical or plumbing work under this permit. electrical and mechanical work to be performed under separate permits by licensed subcontractors · 203 m away
- 209 W Jefferson BlvdJul 30, 2025We will be removing a 5 ton horizontal gas furnace, evaporator coil, and condenser. then installing a 5 ton up-flow gas furnace, evaporator coil, and condenser · 203 m away
- 211 W Jefferson BlvdFeb 4, 2026Mcr interior and exterior alterations ( prop. new elevations ) · 203 m away