groundranger
Recent · latest filing Aug 2026Commercial

224 Sunset Ave

Dallas, TX 75208

Permits address utility power and alterations at 224 Sunset Ave

City of Dallas records show a commercial electrical permit filed March 4, 2026, to restart utility power after it had been off for an extended period. An alteration/addition permit was filed August 19, 2026; its narrative describes an empty, restored building and a door added to one room, while the applicant disputes that the work required an alteration permit.

Summarized from City of Dallas records · updated Aug 19, 2026

Projects
2
2 filings
Latest filing
Aug 19, 2026
since Mar 4, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. The building was apparently previously altered. i have not made any alterations. it was restored to a white empty building. a door was added to one room. i applied for my co-26-003745 and applied at the beginning of june. i have paid and now am being told an alteration addition is need two months later. the building has been painted and restored to its original condition as advertised to me by contractors of the owner. the building is empty with no furniture. requesting this be reviewed as soon as possible so that i can get my co approved

    The building was apparently previously altered. i have not made any alterations. it was restored to a white empty building. a door was added to one room. i applied for my co-26-003745 and applied at the beginning of june. i have paid and now am being told an alteration addition is need two months later. the building has been painted and restored to its original condition as advertised to me by contractors of the owner. the building is empty with no furniture. requesting this be reviewed as soon as possible so that i can get my co approved

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001951
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. This permit is being required by oncor to restart utility power, due to being off for so long

    This permit is being required by oncor to restart utility power, due to being off for so long

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000432
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 224 Sunset Ave

What is happening at 224 Sunset Ave in Dallas?

City records show a permit to restart utility power and a later alteration/addition permit filing. The August filing narrative describes an empty, restored commercial building.

What permits were filed for 224 Sunset Ave?

A commercial electrical permit, COM-ELC-26-000432, was filed March 4, 2026. A commercial alteration/addition permit, COM-ALT-ADD-26-001951, was filed August 19, 2026.

Why was an electrical permit filed at 224 Sunset Ave?

The March 4, 2026, permit narrative says Oncor required the permit to restart utility power because it had been off for a long time.

What does the alteration permit say about the building?

The August 19, 2026, filing describes the building as empty and restored, and mentions a door added to one room. The applicant says they did not make alterations and disputes the need for the permit.

Is a new building being built at 224 Sunset Ave?

The records provided do not describe new construction. They show an electrical permit and an alteration/addition permit filing.

What business is opening at 224 Sunset Ave?

The records provided do not identify a tenant or business opening at the address.

How much will the work at 224 Sunset Ave cost?

The records provided do not include a project cost estimate or reported permit valuation.

Also being built nearby

All of 75208
Get alerts for 224 Sunset Ave