238 W 12th St
Dallas, TX 75208 · Ionna LLC
Ionna EV charging hub planned for 238 W 12th St
Permits filed starting March 2, 2026 indicate an Ionna electric-vehicle charging hub is planned at 238 W 12th St, with eight charging spaces, including one accessible space. The plans also describe a 135-square-foot equipment structure, canopies, restrooms, site work and utility connections; the TDLR project registration lists an estimated project cost of $250,000.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 5, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Oct 5, 2026
- since Mar 2, 2026
- Largest scope
- 6,142 sf
- Estimated cost
- $250K
- state registration
Where this project stands
Under constructionIONNA - Dallas 12th St. Charging Hub
6,142 sq ft · $250K est.
- RegisteredSep 21, 2026
- Plan review
- ConstructionJun '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
8 projectsNew ev charging station: 8 charging spaces (1 accessible), 135 sq ft equipment structure, accessible route, paving, grading, drainage, utilities and landscaping. site area 6,142 sq ft — ionna - dallas 12th st. charging hub
TDLR project registrationNew ConstructionReview Complete6,142 sq ft$250K est.- Project #
- TABS2027001511
- Tenant / owner
- Ionna - Dallas 12th St. Charging Hub
- Design firm
- Pro
- Contact
- Pro
Installation of conduit, conductor, and wiring of customer provided equipment for electric vehicle charging dispensers
Installation of conduit, conductor, and wiring of customer provided equipment for electric vehicle charging dispensers
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 238 W 12th St
What is being built at 238 W 12th St in Dallas?
Permits indicate an Ionna EV charging hub with eight charging spaces, including one accessible space. Plans also describe a 135-square-foot equipment structure, canopies, restrooms and site work.
Is Ionna opening an EV charging station at 238 W 12th St?
A TDLR registration dated September 21, 2026, describes a new Ionna EV charging station at the address. It lists eight charging spaces, one of them accessible.
How many charging spaces will the Ionna Dallas 12th St. hub have?
The TDLR project registration lists eight charging spaces, including one accessible space.
What permits have been filed for 238 W 12th St?
Dallas permits filed March 2, 2026, include a commercial new construction permit for canopies with EV charging stations and restrooms, plus permits for site work and construction phases. An electrical permit dated April 6 covers wiring for EV charging dispensers.
How much will the Ionna charging hub cost?
The TDLR registration lists $250,000 as the applicant's estimated cost for the project. This is an estimate, not a confirmed final cost.
When was the latest permit filed for the Ionna charging hub?
The latest listed Dallas permit is a service release dated October 5, 2026, permit COM-ELC-26-004952. The TDLR project registration was dated September 21, 2026.
Also being built nearby
All of 75208- 238 W 12th Street · Solpanelec 4 0 LLCAug 7, 2024Ionna charging hub 12th st. dallas — new construction — remove a portion of existing concrete and landscape area and install (4) ev dispensers, transformer, step down transformer, prefabricated c-store with vending machines, canopy, new parking area to include new curbing, paving, striping and stencil
- 325 W 12th StJan 27, 2026Water service install for building 4in to meter - outside in front yard area · 25 m away
- 339 W Page AveOct 20, 2020Remove existing roof and install new roof · 104 m away
- 309 Centre StNov 4, 2025Perform a gas test · 136 m away
- 403 W 12th StJun 15, 2026Replacing a 4 ton rtu hvac system · 146 m away
- 511 S Zang BlvdJan 13, 2026Move combi oven to new location waters and floor sink. install black steel line from fryer to grease tank outside · 177 m away
- 423 W 12th StOct 29, 2025Demolition property · 179 m away
- 407 Centre StNov 11, 2025We are requesting validation to ensure that the existing plumbing system complies with current city of dallas code requirements. the previous owner or tenant appears to have made alterations, but the scope and details of those changes are unknown. an inspection is needed to verify code compliance and determine whether any corrections are required · 204 m away
- 408 Centre StJan 10, 2023Interior remodel only- 408 centre st- second floor · 207 m away
- 110 West Jefferson · 110 West JeffersonApr 19, 2024Siniola michelada restaurant — renovation/alteration — interior remodel of an existing retail space for a new restaurant · 216 m away
- 110 W Jefferson BlvdSep 14, 2026Interior remodel for restaurant use · 216 m away
- 118 W Jefferson BlvdOct 8, 2020Erect attached sign · 216 m away