403 W 12th St
Dallas, TX 75208
Two HVAC replacements permitted at 403 W 12th St
City of Dallas permits show HVAC replacement work at 403 W 12th St: one permit for a 2.5-ton unit being replaced with a 3-ton unit, filed January 30, 2026, and another for a 4-ton rooftop unit, filed June 15, 2026. The records describe mechanical work and do not identify a new business or other project purpose.
Summarized from City of Dallas records · updated Jun 15, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 15, 2026
- since Jan 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 403 W 12th St
What is being built at 403 W 12th St, Dallas?
City of Dallas permits show two HVAC replacement projects at the address. They do not describe a new building or identify a business.
What work was permitted at 403 W 12th St?
Permit COM-MEC-26-000167, filed January 30, 2026, covers replacing a 2.5-ton rooftop unit with a 3-ton unit. Permit COM-MEC-26-001342, filed June 15, 2026, covers replacing a 4-ton rooftop HVAC unit.
When were the HVAC permits filed for 403 W 12th St?
The two City of Dallas commercial mechanical permits were filed January 30, 2026, and June 15, 2026.
Is a new business opening at 403 W 12th St?
The available permits document HVAC replacement work but do not name a business or say that one is opening.
What's happening near Ionna's Dallas 12th St. Charging Hub?
At 403 W 12th St, about 146 meters from the Ionna - Dallas 12th St. Charging Hub, City of Dallas permits show two HVAC replacements. The records do not indicate a connection between the projects.
Also being built nearby
All of 75208- 423 W 12th StOct 29, 2025Demolition property · 34 m away
- 408 Centre StJan 10, 2023Interior remodel only- 408 centre st- second floor · 88 m away
- 424 Centre StFeb 3, 2026Running a new gas line in 1” black iron to from gas meter to furnace in attic. furnace is the only gas appliance · 107 m away
- 407 Centre StNov 11, 2025We are requesting validation to ensure that the existing plumbing system complies with current city of dallas code requirements. the previous owner or tenant appears to have made alterations, but the scope and details of those changes are unknown. an inspection is needed to verify code compliance and determine whether any corrections are required · 113 m away
- 436 Centre StMar 25, 2026Demolition of the existing sidewalk concrete in the front of the building (approx. 180 sq ft) no approach.build a new sidewalk concrete in the front of the building · 115 m away
- 423 Centre StJun 24, 2024Remodel finish out com-423 centre st · 118 m away
- 325 W 12th StJan 27, 2026Water service install for building 4in to meter - outside in front yard area · 135 m away
- 238 W 12th St · Ionna LLCOct 5, 2026Service release · 146 m away
- 238 W 12th Street · Solpanelec 4 0 LLCAug 7, 2024Ionna charging hub 12th st. dallas — new construction — remove a portion of existing concrete and landscape area and install (4) ev dispensers, transformer, step down transformer, prefabricated c-store with vending machines, canopy, new parking area to include new curbing, paving, striping and stencil · 146 m away
- 339 W Page AveOct 20, 2020Remove existing roof and install new roof · 168 m away
- 408 W Jefferson BlvdAug 27, 2025Clean & show · 193 m away
- 420 W Jefferson BlvdDec 30, 2025Co-25-003730mcr add dressing room · 195 m away