415 W Colorado Blvd
Dallas, TX 75208
415 W Colorado Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 415 W Colorado Blvd, Dallas, TX 75208. The most recent, filed November 30, 2020, covers: “Replace water service”.
Compiled from City of Dallas records · updated Nov 30, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 30, 2020
- since Nov 30, 2020
- Largest scope
- —
- Listed value
- $41
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 415 W Colorado Blvd
What is being built at 415 W Colorado Blvd?
The latest filing (City of Dallas permit 2011303065, November 30, 2020) covers replace water service.
How many permits and filings does 415 W Colorado Blvd have?
1 filing across 1 project, from November 30, 2020 to November 30, 2020.
How much is the construction at 415 W Colorado Blvd worth?
Permits at this address list about $41 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 415 W Colorado Blvd?
Yes. Nearby filings include 419 W Colorado Blvd (new 8' horizontal picket fence on the north, and east portion of the lot. additional fence gates located on south portion of the lot. *note* existing neighbor fence on the west portion of the lot, Jul 21, 2025); 423 W Colorado Blvd (construct new sfd, Dec 28, 2020); 433 W Colorado Blvd (gas line to pool heater, May 4, 2026).
How do I get alerts for new permits at 415 W Colorado Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 419 W Colorado BlvdJul 21, 2025New 8' horizontal picket fence on the north, and east portion of the lot. additional fence gates located on south portion of the lot. *note* existing neighbor fence on the west portion of the lot · 14 m away
- 423 W Colorado BlvdDec 28, 2020Construct new sfd · 29 m away
- 433 W Colorado BlvdMay 4, 2026Gas line to pool heater · 69 m away
- 447 W Colorado BlvdJun 29, 2026Installing amana split air conditioner 14.3 seer2, single stage · 75 m away
- 434 Allison DrSep 30, 2025Bathroom remodel · 87 m away
- 416 Allison DrMay 14, 2025Replace 3 ton heat pump hvac system · 101 m away
- 402 Allison DrSep 9, 2025200 amp panel replacement · 120 m away
- 1231 Haines AveJun 16, 2026Erecting 8ft cedar fence to replace old fence · 133 m away
- 1230 Haines AveSep 28, 2026Gas test · 138 m away
- 1306 Woodlawn AveAug 28, 2025To replace a 3 ton system · 142 m away
- 1223 Haines AveSep 14, 202650 gallon electric water heater · 148 m away
- 1303 Woodlawn AveFeb 20, 2026Install 2 - 50 gallon gas water heaters in the attic · 154 m away