434 Allison Dr
Dallas, TX 75208
Interior remodel and system work at 434 Allison Dr
City of Dallas permits indicate an interior remodel at 434 Allison Dr, including bathroom, electrical, and mechanical work. The alteration permit was filed September 12, 2025, followed by electrical work on September 24 and plumbing and mechanical permits on September 30.
Summarized from City of Dallas records · updated Sep 30, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Sep 30, 2025
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 434 Allison Dr
What is being built at 434 Allison Dr, Dallas?
City records indicate an interior remodel of a residence, with bathroom, electrical, and mechanical work. The alteration permit is RES-ALT-ADD-25-000822, filed September 12, 2025.
When were permits filed for the remodel at 434 Allison Dr?
The interior alteration permit was filed September 12, 2025. Related electrical work was filed September 24, and plumbing and mechanical permits were filed September 30, 2025.
What does the bathroom permit cover at 434 Allison Dr?
The City of Dallas record describes a bathroom remodel. It was filed September 30, 2025, under permit RES-PLM-25-005510.
What mechanical work is permitted at 434 Allison Dr?
The mechanical permit describes relocating duct work and adding a return. It was filed September 30, 2025, as permit RES-MEC-25-002897.
What remodel work is happening near Venture Commercial Management in Dallas?
At 434 Allison Dr, about 235 meters from Venture Commercial Management, City of Dallas permits indicate an interior remodel with bathroom, electrical, and mechanical work. The filings are dated September 12, 24, and 30, 2025.
Also being built nearby
All of 75208- 416 Allison DrMay 14, 2025Replace 3 ton heat pump hvac system · 36 m away
- 402 Allison DrSep 9, 2025200 amp panel replacement · 64 m away
- 415 W Colorado BlvdNov 30, 2020Replace water service · 87 m away
- 419 W Colorado BlvdJul 21, 2025New 8' horizontal picket fence on the north, and east portion of the lot. additional fence gates located on south portion of the lot. *note* existing neighbor fence on the west portion of the lot · 89 m away
- 423 W Colorado BlvdDec 28, 2020Construct new sfd · 92 m away
- 1420 Junior DrFeb 23, 2026Remove and replace existing roof. we are going to install an owens corning class 4 roofing system. new underlayment, vents, pipe jacks. trash haul off 10yr labor warranty · 106 m away
- 433 W Colorado BlvdMay 4, 2026Gas line to pool heater · 111 m away
- 447 W Colorado BlvdJun 29, 2026Installing amana split air conditioner 14.3 seer2, single stage · 115 m away
- 1414 Junior DrApr 27, 2026Installation of a new shutoff valve in the back yard · 115 m away
- 1306 Woodlawn AveAug 28, 2025To replace a 3 ton system · 163 m away
- 1303 Woodlawn AveFeb 20, 2026Install 2 - 50 gallon gas water heaters in the attic · 176 m away
- 446 W Greenbriar LnJun 15, 2026Replace 4 ton gas hvac unit · 204 m away