507 W Main St
Dallas, TX 75208
Water line replacement permitted at 507 W Main St
A residential plumbing permit covers replacement of a 60-foot water line in the yard, from the meter to the home at 507 W Main St. The City of Dallas permit was filed on January 30, 2026.
Summarized from City of Dallas records · updated Jan 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 30, 2026
- since Jan 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 507 W Main St
What work is permitted at 507 W Main St in Dallas?
A City of Dallas residential plumbing permit covers replacing the water line in the yard from the meter to the home. The permit describes 60 feet of line.
When was the water line replacement permitted at 507 W Main St?
The permit was filed on January 30, 2026. Its number is RES-PLM-26-001128.
Is a new home being built at 507 W Main St?
The available permit describes water line replacement, not construction of a new home. It covers a 60-foot line from the meter to the home.
How long is the water line being replaced at 507 W Main St?
The permit description specifies 60 feet of water line in the yard, running from the meter to the home.
What work is permitted near City of Dallas at 507 W Main St?
At 507 W Main St, the City of Dallas issued a residential plumbing permit for water line replacement. The filing date was January 30, 2026.
Also being built nearby
All of 75208- 2317 Beaver StJul 9, 2025Replace damaged feeder wires between transocket and switch gear · 193 m away
- 611 Yuma CtAug 7, 2026Bu zo addition of a non-structural partition wall to separate the lobby area from work spaces:- this partition will tie into the existing partition wall- no other elements will be involved · 204 m away
- 427 W Commerce StJun 6, 2025Electrical remodel · 218 m away
- 411 W. Commerce Street · Equity Residential Management, L.l.c.Jun 5, 2025Treazure studios - trinity grove — renovation/alteration — interior buildout of salon suites including mep, partitions, finishes, plumbing fixtures, and ada restrooms in an existing shell space for beauty and wellness services. no structural work included · 230 m away
- 411 W Commerce StNov 5, 2026#303 changeout existing system & install 1.5 ton split system · 230 m away
- 2612 Yuma StNov 12, 2026Zo bc interior remodel and creation of suite 300 · 252 m away
- 510 W Commerce Street 1100 N Zang Boulevard · City Of DallasJul 16, 2025City of dallas dart bike lane improvement program — renovation/alteration — the project includes bike lane reconstruction and the addition of a minimum of 2 bus stop islands · 257 m away
- 539 W Commerce StNov 18, 2026Gas test · 264 m away
- 2330 Spencer CtJul 6, 2026Nsfaacontinuation of contstruction and addtional repairs related to nsfd #1810091184 · 304 m away
- 330 W Main StOct 15, 2025Demolish the wood/brick structure · 304 m away
- 324 W Main StOct 15, 2025Demolish the main wooden structure · 315 m away
- 323 W Main StSep 8, 2026Demolition of a church using heavy equipment · 317 m away