510 W Commerce Street 1100 N Zang Boulevard
Dallas, TX 75208 · City Of Dallas
Dallas bike lane work includes at least two bus stop islands
The City of Dallas DART Bike Lane Improvement Program includes bike lane reconstruction and at least two bus stop islands on W Commerce Street and N Zang Boulevard. The TDLR project registration was filed July 16, 2025, and lists an estimated project cost of $1.38 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2025
- since Jul 16, 2025
- Largest scope
- 108,250 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
Inspected · closing outCity of Dallas DART Bike Lane Improvement Program
108,250 sq ft · $1.4M est.
- RegisteredJul 16, 2025
- Plan review
- ConstructionOct '25 – Mar '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project includes bike lane reconstruction and the addition of a minimum of 2 bus stop islands. — w commerce street (fort worth avenue to beckley avenue) and n zang boulevard (beckley avenue to
TDLR project registrationRenovation/AlterationInspection Complete108,250 sq ft$1.4M est.- Project #
- TABS2025023614
- Tenant / owner
- City Of Dallas Dart Bike Lane Improvement Program
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 510 W Commerce Street 1100 N Zang Boulevard
What is being built at 510 W Commerce Street and 1100 N Zang Boulevard?
The City of Dallas DART Bike Lane Improvement Program calls for bike lane reconstruction and at least two bus stop islands on W Commerce Street and N Zang Boulevard.
When was the Dallas bike lane project permitted?
The TDLR project registration, TABS2025023614, was filed July 16, 2025.
How much will the W Commerce Street and N Zang Boulevard project cost?
The TDLR registration lists an estimated project cost of $1.38 million. This is the applicant's estimate for the project.
How many bus stop islands are planned?
The project description specifies a minimum of two bus stop islands.
Is a new building going up at 510 W Commerce Street?
The registration describes street improvements, including bike lane reconstruction and bus stop islands, rather than a new building.
What construction is planned near Blank Haus Studio on Fort Worth Avenue?
The nearby project is the City of Dallas DART Bike Lane Improvement Program on W Commerce Street and N Zang Boulevard. Its TDLR registration was filed July 16, 2025.
Also being built nearby
All of 75208- 539 W Commerce StNov 18, 2026Commercial plumbing permit: gas test · 66 m away
- 611 Yuma CtAug 7, 2026Bu zo addition of a non-structural partition wall to separate the lobby area from work spaces:- this partition will tie into the existing partition wall- no other elements will be involved · 75 m away
- 2317 Beaver StJul 9, 2025Replace damaged feeder wires between transocket and switch gear · 79 m away
- 707 W Commerce StMay 18, 2026Mcr interior and exterior renovations on 16-unit multifamily property.exterior includes: replacing front and back unit entry doors, frames, and trim at 16 units; replace broken/missing windows at units 2303, 2335, 2343, 2359; replace damaged 4x8 hardie boards at both buildings; repair chain link fence; replace 3 damaged exterior light fixtures and 1 doorbell. replace missing hose bibs. patch and restore any holes found at roof.interior includes: install new air handlers at 16 units, install new condensers at 8 units to match existing, repair line sets if needed. install new drywall and insulation where repairs are needed. install new baseboards and casings where missing or damaged. replace cracked floor tile at balconies. repair tub surround at unit 2322. demolition and install new cabinet and countertop where needed in units 2362, 2311, 2351. install 3 new light fixtures, 1 thermostat, 1 doorbell chime, 1 smoke detector where missing or damaged. install new shower trim kits, sinks, and faucets where missing or damaged. install new flooring throughout. install new door hardware and bathroom hardware where missing or damaged. new appliances where missing or damaged. new window blinds in all units · 183 m away
- 2306 Spencer CtJul 6, 2026Nsfaa continuation of contstruction and addtional repairs related to nsfd #1810091188 · 192 m away
- 2314 Spencer CtJul 6, 2026Nsfaa continuation of contstruction and addtional repairs related to nsfd #1810091187 · 192 m away
- 2322 Spencer CtJul 6, 2026Continuation of contstruction and addtional repairs related to nsfd #1810091185 · 194 m away
- 2338 Spencer CtJul 6, 2026Nsfaacontinuation of contstruction and addtional repairs related to nsfd 1810091183 · 196 m away
- 2346 Spencer CtJul 6, 2026Continuation of contstruction and addtional repairs related to nsfd #1810091181 · 198 m away
- 2354 Spencer CtJul 6, 2026Nsfaa continuation of contstruction and addtional repairs related to nsfd #1810091180 · 199 m away
- 2362 Spencer CtJul 6, 2026Nsfaacontinuation of contstruction and addtional repairs related to nsfd #1810091179 · 201 m away
- 2330 Spencer CtJul 6, 2026Nsfaacontinuation of contstruction and addtional repairs related to nsfd #1810091184 · 201 m away