518 S Edgefield Ave
Dallas, TX 75208
518 S Edgefield Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 518 S Edgefield Ave, Dallas, TX 75208. The most recent, filed September 23, 2020, covers: “Interior remodel only”.
Compiled from City of Dallas records · updated Sep 23, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Sep 23, 2020
- since Sep 23, 2020
- Largest scope
- —
- Listed value
- $45
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 518 S Edgefield Ave
What is being built at 518 S Edgefield Ave?
The latest filing (City of Dallas permit 2009234007, September 23, 2020) covers interior remodel only.
How many permits and filings does 518 S Edgefield Ave have?
2 filings across 2 projects, from September 23, 2020 to September 23, 2020.
How much is the construction at 518 S Edgefield Ave worth?
Permits at this address list about $45 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Dallas Independent School District in Dallas?
518 S Edgefield Ave is about 23 m from Dallas Independent School District (501 S Edgefield Ave). Its latest filing is for interior remodel only.
Is there other construction near 518 S Edgefield Ave?
Yes. Nearby filings include 522 S Edgefield Ave (remount the electrical service that was pulled off from wall, Jul 14, 2026); 501 S Edgefield Ave (installed hvac equipment, Dec 19, 2025); 531 S Clinton Ave (rewire, Jul 2, 2026).
How do I get alerts for new permits at 518 S Edgefield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 522 S Edgefield AveJul 14, 2026Remount the electrical service that was pulled off from wall · 4 m away
- 501 S Edgefield Ave · Dallas Independent School DistrictDec 19, 2025Installed hvac equipment · 23 m away
- 531 S Clinton AveJul 2, 2026Rewire · 99 m away
- 535 S Clinton AveNov 5, 2025Drain replacement · 99 m away
- 507 S Clinton AveSep 15, 2025Install tesla charge next to driveway - 60a circuit. 200a ge panel located in rear of home · 102 m away
- 528 S Clinton AveMay 22, 2025Remove and replace roofing system with iko dynasty · 111 m away
- 526 S Clinton AveJul 24, 2026New rewire -new service · 111 m away
- 622 S Clinton AveAug 26, 2025Replace 2.5 ton complete gas system · 150 m away
- 626 S Clinton AveAug 25, 2026To replace a 3 ton system · 153 m away
- 1500 W 12th StMar 26, 2026New installation · 159 m away
- 426 S Clinton AveOct 16, 2025158 lf of 8' board on board cedar fencing with double trim & 2x6" cap board with galvanized steel posts · 159 m away
- 407 S Windomere AveOct 9, 2025Solar panel installation on roof top · 181 m away