526 S Clinton Ave
Dallas, TX 75208
Home alterations and repairs permitted at 526 S Clinton Ave
Dallas permits indicate alterations and repairs to a home at 526 S Clinton Ave, including foundation work, a new interior bathroom, deck enlargement, and a new private driveway. The first filing was March 12, 2026, and the latest was July 24, 2026, when plumbing and electrical permits were filed.
Summarized from City of Dallas records · updated Jul 24, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jul 24, 2026
- since Mar 12, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsNsfaa- residential alteration to include an exterior wall modification for a new window opening, residential deck repair and enlargement, a new private driveway on-property, and a new interior full bathroom within the existing footprint of the house per conservation certificate con-dist-wr-26-000451 (carport less than 200 sq ft detached no permit needed, just cd approval)
Nsfaa- residential alteration to include an exterior wall modification for a new window opening, residential deck repair and enlargement, a new private driveway on-property, and a new interior full bathroom within the existing footprint of the house per conservation certificate con-dist-wr-26-000451 (carport less than 200 sq ft detached no permit needed, just cd approval)
City of Dallas permitResidential Alteration Addition PermitPier beam foundation repair and foundation skirting. the south winnetka heights conservation district has issued a conservation district work service and it is attached as well as the engineering report
Pier beam foundation repair and foundation skirting. the south winnetka heights conservation district has issued a conservation district work service and it is attached as well as the engineering report
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 526 S Clinton Ave
What is being built at 526 S Clinton Ave in Dallas?
Permits indicate alterations and repairs to a home, not a new building. The work includes a new interior bathroom, deck repair and enlargement, a private driveway, foundation repair, plumbing, and electrical work.
When were permits filed for 526 S Clinton Ave?
The first filing was March 12, 2026, for a gas test and release. The latest filings were July 24, 2026, for plumbing and electrical work.
What does the alteration permit at 526 S Clinton Ave cover?
Permit RES-ALT-ADD-26-001302, filed July 14, 2026, covers an exterior wall modification for a new window opening, deck repair and enlargement, a new private driveway, and a new interior full bathroom within the existing house footprint.
Is the house at 526 S Clinton Ave getting foundation work?
A Dallas foundation repair permit filed June 24, 2026, describes pier-and-beam foundation repair and foundation skirting.
What plumbing and electrical work is planned at 526 S Clinton Ave?
The July 24, 2026 plumbing permit describes work for two baths, a washer box, kitchen, and gas. An electrical permit filed the same day describes a new rewire and service.
Also being built nearby
All of 75208- 528 S Clinton AveMay 22, 2025Remove and replace roofing system with iko dynasty · 2 m away
- 531 S Clinton AveJul 2, 2026Rewire · 13 m away
- 535 S Clinton AveNov 5, 2025Drain replacement · 15 m away
- 507 S Clinton AveSep 15, 2025Install tesla charge next to driveway - 60a circuit. 200a ge panel located in rear of home · 25 m away
- 622 S Clinton AveAug 26, 2025Replace 2.5 ton complete gas system · 105 m away
- 426 S Clinton AveOct 16, 2025158 lf of 8' board on board cedar fencing with double trim & 2x6" cap board with galvanized steel posts · 108 m away
- 626 S Clinton AveAug 25, 2026To replace a 3 ton system · 109 m away
- 518 S Edgefield AveSep 23, 2020Interior remodel only · 111 m away
- 522 S Edgefield AveJul 14, 2026Remount the electrical service that was pulled off from wall · 112 m away
- 501 S Edgefield Ave · Dallas Independent School DistrictDec 19, 2025Installed hvac equipment · 127 m away
- 609 S Winnetka AveMay 6, 2026Install new plumbing for remodel and house addtion · 136 m away
- 602 S Winnetka AveJan 12, 2026Interior installmount tankless heater, repipe water lines & discharge, isolating valves, vent piping & removal of old heaterflood stop valve connects to water inlet. wired sensor is set in water heater pan. if water touches sensor it will trip valve to shut off water to heater and sound off alarm to alert homeowner. this device helps eliminate water damage.having roofing contractor replace roof jack · 142 m away
More restaurants in 75208.