600 N Tyler St
Dallas, TX 75208
600 N Tyler St: 1 project on record
City of Dallas lists 1 filing across 1 project at 600 N Tyler St, Dallas, TX 75208. The most recent, filed October 22, 2020, covers: “Erect attached sign”.
Compiled from City of Dallas records · updated Oct 22, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 22, 2020
- since Oct 22, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 600 N Tyler St
What is being built at 600 N Tyler St?
The latest filing (City of Dallas permit 2009231114, October 22, 2020) covers erect attached sign.
How many permits and filings does 600 N Tyler St have?
1 filing across 1 project, from October 22, 2020 to October 22, 2020.
Is there other construction near 600 N Tyler St?
Yes. Nearby filings include 625 N Tyler St (miinc to perform gas pressure test at residence before dallas inspection. no gas service at this site for the last year, Jan 29, 2026); 1015 Kings Hwy (residential full demolition, Oct 9, 2026); 1025 Kings Hwy (gas test, Dec 4, 2025).
How do I get alerts for new permits at 600 N Tyler St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 625 N Tyler StJan 29, 2026Miinc to perform gas pressure test at residence before dallas inspection. no gas service at this site for the last year · 82 m away
- 1015 Kings HwyOct 9, 2026Residential full demolition · 86 m away
- 1025 Kings HwyDec 4, 2025Gas test · 95 m away
- 628 N Tyler StOct 28, 2020Install water heater · 100 m away
- 937 W Davis StAug 24, 2026Tpo · 102 m away
- 829 W Davis StNov 18, 2020Upgrade existing electrical service · 114 m away
- 642 N Tyler StOct 21, 2020Gas test · 122 m away
- 649 N Tyler StJul 22, 2025Drawings and pics are in the attached structural engineer's report. unit 102 was hit by a car that launched from the roundabout. we are not altering the structure from its previous state. we are putting it back together as it was, with like and kind material. 1. remove and replace damaged brick veneer. 2. remove and replace damaged framing. 3. remove, replace and paint damaged siding. 4. remove and replace three damaged windows and sills. 5. replace front entry door and garage entry door. 6. remove, replace, tape, texture and paint sheetrock for damaged areas 7. repair and paint exterior column · 124 m away
- 832 W 7th StJun 11, 2025Replacing old driveway and will touch the sidewalk and drive approach · 129 m away
- 648 N Tyler StJan 21, 2026Gas test · 132 m away
- 814 W Davis StFeb 27, 2026Electrical outlets, lights · 137 m away
- 421 N Tyler StNov 11, 2026New restroom and kitchen · 139 m away