642 N Tyler St
Dallas, TX 75208
642 N Tyler St: 1 project on record
City of Dallas lists 1 filing across 1 project at 642 N Tyler St, Dallas, TX 75208. The most recent, filed October 21, 2020, covers: “Gas test”.
Compiled from City of Dallas records · updated Oct 21, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 21, 2020
- since Oct 21, 2020
- Largest scope
- —
- Listed value
- $35
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 642 N Tyler St
What is being built at 642 N Tyler St?
The latest filing (City of Dallas permit 2010213005, October 21, 2020) covers gas test.
How many permits and filings does 642 N Tyler St have?
1 filing across 1 project, from October 21, 2020 to October 21, 2020.
How much is the construction at 642 N Tyler St worth?
Permits at this address list about $35 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 642 N Tyler St?
Yes. Nearby filings include 648 N Tyler St (gas test, Jan 21, 2026); 649 N Tyler St (drawings and pics are in the attached structural engineer's report. unit 102 was hit by a car that launched from the roundabout. we are not altering the structure from its previous state. we are putting it back together as it was, with like and kind material. 1. remove and replace damaged brick veneer. 2. remove and replace damaged framing. 3. remove, replace and paint damaged siding. 4. remove and replace three damaged windows and sills. 5. replace front entry door and garage entry door. 6. remove, replace, tape, texture and paint sheetrock for damaged areas 7. repair and paint exterior column, Jul 22, 2025); 628 N Tyler St (install water heater, Oct 28, 2020).
How do I get alerts for new permits at 642 N Tyler St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 648 N Tyler StJan 21, 2026Gas test · 9 m away
- 649 N Tyler StJul 22, 2025Drawings and pics are in the attached structural engineer's report. unit 102 was hit by a car that launched from the roundabout. we are not altering the structure from its previous state. we are putting it back together as it was, with like and kind material. 1. remove and replace damaged brick veneer. 2. remove and replace damaged framing. 3. remove, replace and paint damaged siding. 4. remove and replace three damaged windows and sills. 5. replace front entry door and garage entry door. 6. remove, replace, tape, texture and paint sheetrock for damaged areas 7. repair and paint exterior column · 13 m away
- 628 N Tyler StOct 28, 2020Install water heater · 23 m away
- 625 N Tyler StJan 29, 2026Miinc to perform gas pressure test at residence before dallas inspection. no gas service at this site for the last year · 43 m away
- 600 N Tyler StOct 22, 2020Erect attached sign · 122 m away
- 851 Winston StJan 6, 2021Remove existing roof and install new roof · 123 m away
- 925 Winston StFeb 9, 2026Retire some interior room · 127 m away
- 1015 Kings HwyOct 9, 2026Residential full demolition · 142 m away
- 1025 Kings HwyDec 4, 2025Gas test · 143 m away
- 628 N Polk StJun 16, 2026No final inspections until after the final plat is recorded in the appropriate county and the recorded plats returned to subdivision in room 101 at 320 e jefferson blvd. nsfaa duplex at polk street · 159 m away
- 937 W Davis StAug 24, 2026Tpo · 161 m away
- 633 N Vernon AveDec 4, 2020Install lawn sprinkler · 162 m away