650 Fort Worth Ave
Dallas, TX 75208 · Blank Haus Studio
Blank Haus Studio interior finish-out at 650 Fort Worth Ave
Permit records indicate an interior finish-out for Blank Haus Studio at 650 Fort Worth Ave. The project was registered with TDLR on January 8, 2026, and Dallas permits filed through March 2 cover alteration work, plumbing, electrical work, and mechanical equipment.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Mar 2, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Mar 2, 2026
- since Jan 8, 2026
- Largest scope
- 2,122 sf
- Estimated cost
- $210K
- state registration
Where this project stands
Under constructionBLANK HAUS STUDIO
2,122 sq ft · $210K est.
- RegisteredJan 8, 2026
- Plan review
- ConstructionJun '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
7 projectsInterior finish out — blank haus studio
TDLR project registrationNew ConstructionReview Complete2,122 sq ft$210K est.- Project #
- TABS2026009641
- Tenant / owner
- Blank Haus Studio
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 650 Fort Worth Ave
What is being built at 650 Fort Worth Ave in Dallas?
Records indicate an interior finish-out for Blank Haus Studio. TDLR project registration TABS2026009641 describes a 2,122-square-foot project.
When was the Blank Haus Studio project permitted?
The TDLR registration was filed January 8, 2026. Dallas permits followed from February 4 through March 2, 2026.
How much will the Blank Haus Studio project cost?
The TDLR registration lists an applicant estimate of $210,000 for the project. This is an estimate, not a confirmed final cost.
What work is planned at 650 Fort Worth Ave?
Dallas permit records include alteration work, plumbing rough-in and finish, electrical work, and mechanical equipment. The mechanical permit lists a 12.5-ton rooftop unit and a four-foot hood vent.
How large is the Blank Haus Studio finish-out?
The TDLR registration lists the project at 2,122 square feet.
What permits were filed for 650 Fort Worth Ave?
Dallas records list alteration permit COM-ALT-ADD-26-000071 on February 4, plumbing permit COM-PLM-26-000556 on February 12, electrical permit COM-ELC-26-000719 on February 19, and mechanical permit COM-MEC-26-000504 on March 2, 2026.
Also being built nearby
All of 75208- 707 Fort Worth AveJul 27, 2026Electric not work · 88 m away
- 727 Fort Worth AveOct 21, 2026New ductwork, new line sets, rtu, make up outside air units, (2) vrf units (2 heads 1 condenser) · 120 m away
- 710 Fort Worth AveFeb 12, 2026Conect coolers · 121 m away
- 739 Fort Worth AveFeb 2, 2026Electrical work for single phase 100 amps service · 141 m away
- 801 Seale StSep 16, 2025Electrical service reconnection · 176 m away
- 2200 Evanston AveJul 13, 2025I am the leasing party at this location under the business name gallery defi. dba defi our co is in my business partners name kyle sauter and co number is 2208021054, the building owner has changed and we need to have the electricity set up in our entity name. txu is telling us we need a permit to deliver energy thru oncor · 176 m away
- 806 Pollard St · Sylpo LLCSep 19, 2024806 pollard — renovation/alteration — interior finish out · 182 m away
- 510 W Commerce Street 1100 N Zang Boulevard · City Of DallasJul 16, 2025City of dallas dart bike lane improvement program — renovation/alteration — the project includes bike lane reconstruction and the addition of a minimum of 2 bus stop islands · 213 m away
- 707 W Commerce StMay 18, 2026Mcr interior and exterior renovations on 16-unit multifamily property.exterior includes: replacing front and back unit entry doors, frames, and trim at 16 units; replace broken/missing windows at units 2303, 2335, 2343, 2359; replace damaged 4x8 hardie boards at both buildings; repair chain link fence; replace 3 damaged exterior light fixtures and 1 doorbell. replace missing hose bibs. patch and restore any holes found at roof.interior includes: install new air handlers at 16 units, install new condensers at 8 units to match existing, repair line sets if needed. install new drywall and insulation where repairs are needed. install new baseboards and casings where missing or damaged. replace cracked floor tile at balconies. repair tub surround at unit 2322. demolition and install new cabinet and countertop where needed in units 2362, 2311, 2351. install 3 new light fixtures, 1 thermostat, 1 doorbell chime, 1 smoke detector where missing or damaged. install new shower trim kits, sinks, and faucets where missing or damaged. install new flooring throughout. install new door hardware and bathroom hardware where missing or damaged. new appliances where missing or damaged. new window blinds in all units · 215 m away
- 2306 Spencer CtJul 6, 2026Nsfaa continuation of contstruction and addtional repairs related to nsfd #1810091188 · 226 m away
- 539 W Commerce StNov 18, 2026Gas test · 228 m away
- 2109 Sylvan AveOct 21, 2026Commercial alteration addition - roll up door · 229 m away