Residential remodel permitted at 700 N Clinton Ave
A residential alteration and addition at 700 N Clinton Ave was permitted on September 23, 2026. The work includes new room layouts and window openings, along with plumbing, electrical, HVAC, drywall, doors, windows, flooring, cabinetry and paint.
Summarized from City of Dallas records · updated Sep 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2026
- since Sep 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNsfaa-framing out new room layouts, adding window openings, updating plumbing, electrical wiring, hvac system, dry wall, doors, windows, flooring, cabinetry and paint
Nsfaa-framing out new room layouts, adding window openings, updating plumbing, electrical wiring, hvac system, dry wall, doors, windows, flooring, cabinetry and paint
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 700 N Clinton Ave
What is being built at 700 N Clinton Ave?
A residential alteration and addition is permitted at the address. The listed work includes new room layouts, window openings and updates to plumbing, electrical, HVAC and interior finishes.
When was the permit filed for 700 N Clinton Ave?
The City of Dallas permit was filed on September 23, 2026.
What work does the permit cover at 700 N Clinton Ave?
The permit describes framing new room layouts and adding window openings. It also lists plumbing, electrical wiring, HVAC, drywall, doors, windows, flooring, cabinetry and paint.
What is the permit number for 700 N Clinton Ave?
The City of Dallas permit number is RES-ALT-ADD-26-001589. It was filed on September 23, 2026.
Is a new commercial building planned at 700 N Clinton Ave?
The record is for a residential alteration and addition, not a commercial building. It describes interior layout and building-system updates.
Also being built nearby
All of 75208- 708 N Clinton AveOct 28, 2026Mcr new in-ground 170 sq ft concrete pool and associated equipment and pad · 7 m away
- 707 N Clinton AveMar 25, 2026Furnace replacement · 14 m away
- 702 N Edgefield AveDec 7, 2020Interior remodel only · 117 m away
- 1222 Kings HwyOct 31, 2026New hvac and duct work · 119 m away
- 714 N Edgefield AveApr 27, 2026Remodel plumbing & sewer relay · 119 m away
- 707 N Edgefield AveOct 16, 2020Gas test · 130 m away
- 614 N Clinton AveJul 9, 2025Installing a 4 ton gas horizontal hvac unit · 133 m away
- 615 N Clinton AveJun 2, 2025Reroof certainteed landmark weathered wood 30 year warranrty · 133 m away
- 1231 Kings HwyDec 29, 2025Unit #3 - gas pressure test · 140 m away
- 1225 Kings HwyJan 19, 2026Replace 25 feet of clay pipe that’s located underneath the driveway with new pvc. we will saw cut, jackhammer and excavate to expose the sewer line. once the sewer line has been exposed we will remove it and replace it with pvc. after installation is completed, we will perform a hydrostatic test on the work performed and turn it into the city for inspection. 50% is required down and the other 50% upon completion of the pipe being installed · 143 m away
- 607 N Clinton AveAug 14, 2026No work, clean and show, no cost · 145 m away
- 1303 Kings HwyDec 8, 2020Detached carport; cd20091401 · 146 m away