732 N Windomere Ave
Dallas, TX 75208
732 N Windomere Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 732 N Windomere Ave, Dallas, TX 75208. The most recent, filed September 2, 2025, covers: “Gas pressure test”.
Compiled from City of Dallas records · updated Sep 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2025
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 732 N Windomere Ave
What is being built at 732 N Windomere Ave?
The latest filing (City of Dallas permit RES-PLM-25-004285, September 2, 2025) covers gas pressure test.
How many permits and filings does 732 N Windomere Ave have?
1 filing across 1 project, from September 2, 2025 to September 2, 2025.
What is being built near Dallas Independent School District in Dallas?
732 N Windomere Ave is about 128 m from Dallas Independent School District (719 N. Montclair Ave). Its latest filing is for gas pressure test.
Is there other construction near 732 N Windomere Ave?
Yes. Nearby filings include 718 N Windomere Ave (replace (1) tankless water heater, Nov 7, 2025); 707 N Edgefield Ave (gas test, Oct 16, 2020); 718 N Montclair Ave (addition to sfd, Oct 1, 2020).
How do I get alerts for new permits at 732 N Windomere Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 718 N Windomere AveNov 7, 2025Replace (1) tankless water heater · 22 m away
- 707 N Edgefield AveOct 16, 2020Gas test · 110 m away
- 718 N Montclair AveOct 1, 2020Addition to sfd · 116 m away
- 714 N Edgefield AveApr 27, 2026Remodel plumbing & sewer relay · 119 m away
- 800 N Windomere AveApr 23, 2026Locked meter · 118 m away
- 802 N Windomere AveJun 17, 2026Nsfaa expanding outside porch on property. adding wood decking over exiting porch · 120 m away
- 702 N Edgefield AveDec 7, 2020Interior remodel only · 124 m away
- 719 N. Montclair Ave · Dallas Independent School DistrictFeb 15, 2024Rosemont es phase 2 — additions to existing building — 6 classroom addition and restrooms to an existing 3-8th grade campus. approximately 8,400 sq ft · 128 m away
- 811 N Windomere AveApr 27, 2026Replace 4 ton gas ac · 128 m away
- 818 N Windomere AveDec 15, 2025Installing 5 total pilings (5 breakouts) · 133 m away
- 633 N Windomere AveSep 16, 2020Upgrade existing electrical service · 160 m away
- 806 N Montclair AveSep 30, 2026Remodel3 full bath, 1 kitchen, wash room · 179 m away