633 N Windomere Ave
Dallas, TX 75208
633 N Windomere Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 633 N Windomere Ave, Dallas, TX 75208. The most recent, filed September 16, 2020, covers: “Upgrade existing electrical service”.
Compiled from City of Dallas records · updated Sep 16, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2020
- since Sep 16, 2020
- Largest scope
- —
- Listed value
- $19
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 633 N Windomere Ave
What is being built at 633 N Windomere Ave?
The latest filing (City of Dallas permit 2009163009, September 16, 2020) covers upgrade existing electrical service.
How many permits and filings does 633 N Windomere Ave have?
1 filing across 1 project, from September 16, 2020 to September 16, 2020.
How much is the construction at 633 N Windomere Ave worth?
Permits at this address list about $19 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 633 N Windomere Ave?
Yes. Nearby filings include 618 N Windomere Ave (i fixed the leak in the yard potable water leak, Oct 16, 2026); 614 N Windomere Ave (foundation repair, Oct 22, 2020); 1505 W Davis St (replacing 3/4" rpz, Oct 7, 2025).
How do I get alerts for new permits at 633 N Windomere Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 618 N Windomere AveOct 16, 2026I fixed the leak in the yard potable water leak · 24 m away
- 614 N Windomere AveOct 22, 2020Foundation repair · 29 m away
- 1505 W Davis StOct 7, 2025Replacing 3/4" rpz · 46 m away
- 606 N Montclair AveMar 5, 2026Replace prv · 107 m away
- 627 N Montclair AveOct 26, 2026Replacing the feeder conductors for the overhead service · 114 m away
- 635 N Edgefield AveNov 11, 2020Addition of detached garage · 116 m away
- 623 N Edgefield AveSep 22, 2025Reroof to malarkey natural wood asphalt shingle and replace decking with 7/16 osb radiant barrier decking · 116 m away
- 718 N Windomere AveNov 7, 2025Replace (1) tankless water heater · 137 m away
- 500 N Montclair AveJun 30, 2025Replaced all sanitary sewer under pier and beam foundation to two full bathrooms, one kitchen and one laundry room · 143 m away
- 732 N Windomere AveSep 2, 2025Gas pressure test · 160 m away
- 502 N Edgefield AveSep 2, 2026Remodel of 2 restrooms: movement of floor drains, installation of 2 sinks and 2 toilets connecting all to existing sanitary sewer line · 163 m away
- 414 N Montclair AveNov 18, 2026Replace tankless water heater · 164 m away