414 N Montclair Ave
Dallas, TX 75208
414 N Montclair Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 414 N Montclair Ave, Dallas, TX 75208. The most recent, filed November 18, 2026, covers: “Replace tankless water heater”.
Compiled from City of Dallas records · updated Nov 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 414 N Montclair Ave
What is being built at 414 N Montclair Ave?
The latest filing (City of Dallas permit RES-PLM-26-012549, November 18, 2026) covers replace tankless water heater.
How many permits and filings does 414 N Montclair Ave have?
1 filing across 1 project, from November 18, 2026 to November 18, 2026.
Is there other construction near 414 N Montclair Ave?
Yes. Nearby filings include 500 N Montclair Ave (replaced all sanitary sewer under pier and beam foundation to two full bathrooms, one kitchen and one laundry room, Jun 30, 2025); 411 N Montclair Ave (411 n montclair reset reshim 1371sqft to stabilize foundation, Nov 14, 2025); 418 N Windomere Ave (replace existing shingles with iko cambridge shingles in “weather wood” and install 7/16" osb sheathing. roof configuration will remain unchanged. work applies to shingles and sheathing only.gutters & downspouts:replace existing gutters around the home to match current color (almond), profile, and location, Feb 18, 2026).
How do I get alerts for new permits at 414 N Montclair Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 500 N Montclair AveJun 30, 2025Replaced all sanitary sewer under pier and beam foundation to two full bathrooms, one kitchen and one laundry room · 47 m away
- 411 N Montclair AveNov 14, 2025411 n montclair reset reshim 1371sqft to stabilize foundation · 57 m away
- 418 N Windomere AveFeb 18, 2026Replace existing shingles with iko cambridge shingles in “weather wood” and install 7/16" osb sheathing. roof configuration will remain unchanged. work applies to shingles and sheathing only.gutters & downspouts:replace existing gutters around the home to match current color (almond), profile, and location · 98 m away
- 414 N Windomere AveJan 16, 20261 layer composition replace with gaf timberline armorshield ii, ir class 4 · 99 m away
- 406 N Windomere AveNov 12, 2020Gas test · 102 m away
- 606 N Montclair AveMar 5, 2026Replace prv · 109 m away
- 1505 W Davis StOct 7, 2025Replacing 3/4" rpz · 123 m away
- 318 N Montclair AveAug 4, 2026Exterior repaint of existing historic residence per approved certificate of appropriateness. work includes preparation, primer as needed, and repainting of existing exterior painted surfaces only. no changes to building materials, windows, doors, roof, or architectural details · 138 m away
- 627 N Montclair AveOct 26, 2026Replacing the feeder conductors for the overhead service · 140 m away
- 315 N Montclair AveJun 26, 2026Hvac replacement 3 ton gas complete system · 145 m away
- 311 N Montclair AveNov 21, 2025Install concord/single/3.5t/gas/hor · 148 m away
- 414 N Rosemont AveMay 15, 2025Gas leak and repair · 149 m away