Permit filed for a Concord 3.5-ton gas system
A residential mechanical permit indicates installation of a Concord single 3.5-ton gas system at 311 N Montclair Ave. The City of Dallas filed permit RES-MEC-25-003731 on November 21, 2025.
Summarized from City of Dallas records · updated Nov 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2025
- since Nov 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 311 N Montclair Ave
What is being installed at 311 N Montclair Ave?
A City of Dallas residential mechanical permit describes installation of a Concord single 3.5-ton gas system. The permit was filed November 21, 2025.
When was the permit filed for 311 N Montclair Ave?
The City of Dallas filed residential mechanical permit RES-MEC-25-003731 on November 21, 2025.
Is a new home being built at 311 N Montclair Ave?
The record is for a residential mechanical permit, not a new-home construction permit. It describes installation of a Concord single 3.5-ton gas system.
What does permit RES-MEC-25-003731 cover?
The City of Dallas permit description says to install a Concord single 3.5-ton gas system. It was filed on November 21, 2025.
How much will the work at 311 N Montclair Ave cost?
The permit record does not report a project cost or valuation.
Also being built nearby
All of 75208- 307 N Montclair AveSep 18, 2025Replacing the condenser coil and air handler unit · 4 m away
- 315 N Montclair AveJun 26, 2026Hvac replacement 3 ton gas complete system · 4 m away
- 303 N Montclair AveJan 22, 2026Drain repair · 7 m away
- 318 N Montclair AveAug 4, 2026Exterior repaint of existing historic residence per approved certificate of appropriateness. work includes preparation, primer as needed, and repainting of existing exterior painted surfaces only. no changes to building materials, windows, doors, roof, or architectural details · 15 m away
- 223 N Montclair AveJan 30, 2026Replace (1) hvac system · 78 m away
- 217 N Montclair AveOct 15, 2025Electrical work for addition · 83 m away
- 213 N Montclair AveNov 16, 2020Remove existing roof and install new roof · 86 m away
- 201 N Montclair AveApr 28, 2026Bathroom exhaust fan install · 97 m away
- 411 N Montclair AveNov 14, 2025411 n montclair reset reshim 1371sqft to stabilize foundation · 99 m away
- 311 N Windomere AveJul 1, 2026Replace sewer main · 115 m away
- 303 N Windomere AveSep 4, 2026New install · 116 m away
- 221 N Windomere AveMay 16, 2025Replacing existing u/s full system · 140 m away