307 N Montclair Ave
Dallas, TX 75208
307 N Montclair Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 307 N Montclair Ave, Dallas, TX 75208. The most recent, filed September 18, 2025, covers: “Replacing the condenser coil and air handler unit”.
Compiled from City of Dallas records · updated Sep 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2025
- since Sep 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 307 N Montclair Ave
What is being built at 307 N Montclair Ave?
The latest filing (City of Dallas permit RES-MEC-25-002658, September 18, 2025) covers replacing the condenser coil and air handler unit.
How many permits and filings does 307 N Montclair Ave have?
1 filing across 1 project, from September 18, 2025 to September 18, 2025.
Is there other construction near 307 N Montclair Ave?
Yes. Nearby filings include 311 N Montclair Ave (install concord/single/3.5t/gas/hor, Nov 21, 2025); 303 N Montclair Ave (drain repair, Jan 22, 2026); 315 N Montclair Ave (hvac replacement 3 ton gas complete system, Jun 26, 2026).
How do I get alerts for new permits at 307 N Montclair Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 311 N Montclair AveNov 21, 2025Install concord/single/3.5t/gas/hor · 4 m away
- 303 N Montclair AveJan 22, 2026Drain repair · 4 m away
- 315 N Montclair AveJun 26, 2026Hvac replacement 3 ton gas complete system · 7 m away
- 318 N Montclair AveAug 4, 2026Exterior repaint of existing historic residence per approved certificate of appropriateness. work includes preparation, primer as needed, and repainting of existing exterior painted surfaces only. no changes to building materials, windows, doors, roof, or architectural details · 17 m away
- 223 N Montclair AveJan 30, 2026Replace (1) hvac system · 74 m away
- 217 N Montclair AveOct 15, 2025Electrical work for addition · 79 m away
- 213 N Montclair AveNov 16, 2020Remove existing roof and install new roof · 83 m away
- 201 N Montclair AveApr 28, 2026Bathroom exhaust fan install · 94 m away
- 411 N Montclair AveNov 14, 2025411 n montclair reset reshim 1371sqft to stabilize foundation · 102 m away
- 303 N Windomere AveSep 4, 2026New install · 115 m away
- 311 N Windomere AveJul 1, 2026Replace sewer main · 115 m away
- 221 N Windomere AveMay 16, 2025Replacing existing u/s full system · 138 m away