213 N Montclair Ave
Dallas, TX 75208
213 N Montclair Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 213 N Montclair Ave, Dallas, TX 75208. The most recent, filed November 16, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Nov 16, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 16, 2020
- since Nov 16, 2020
- Largest scope
- —
- Listed value
- $9
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 213 N Montclair Ave
What is being built at 213 N Montclair Ave?
The latest filing (City of Dallas permit 2011166004, November 16, 2020) covers remove existing roof and install new roof.
How many permits and filings does 213 N Montclair Ave have?
1 filing across 1 project, from November 16, 2020 to November 16, 2020.
How much is the construction at 213 N Montclair Ave worth?
Permits at this address list about $9 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 213 N Montclair Ave?
Yes. Nearby filings include 217 N Montclair Ave (electrical work for addition, Oct 15, 2025); 223 N Montclair Ave (replace (1) hvac system, Jan 30, 2026); 201 N Montclair Ave (bathroom exhaust fan install, Apr 28, 2026).
How do I get alerts for new permits at 213 N Montclair Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 217 N Montclair AveOct 15, 2025Electrical work for addition · 4 m away
- 223 N Montclair AveJan 30, 2026Replace (1) hvac system · 9 m away
- 201 N Montclair AveApr 28, 2026Bathroom exhaust fan install · 11 m away
- 303 N Montclair AveJan 22, 2026Drain repair · 79 m away
- 307 N Montclair AveSep 18, 2025Replacing the condenser coil and air handler unit · 83 m away
- 311 N Montclair AveNov 21, 2025Install concord/single/3.5t/gas/hor · 86 m away
- 315 N Montclair AveJun 26, 2026Hvac replacement 3 ton gas complete system · 90 m away
- 318 N Montclair AveAug 4, 2026Exterior repaint of existing historic residence per approved certificate of appropriateness. work includes preparation, primer as needed, and repainting of existing exterior painted surfaces only. no changes to building materials, windows, doors, roof, or architectural details · 95 m away
- 211 N Windomere AveDec 11, 2025Replace roof · 116 m away
- 221 N Windomere AveMay 16, 2025Replacing existing u/s full system · 116 m away
- 131 N Montclair AveJan 22, 2021Install roof mounted solar panels · 118 m away
- 127 N Montclair AveAug 7, 2026Gas work for generator install · 123 m away