Recent · latest filing Jun 2026Residential
315 N Montclair Ave
Dallas, TX 75208
3-ton gas HVAC system replacement permitted in Dallas
A residential permit covers replacement of a complete 3-ton gas HVAC system at 315 N Montclair Ave. The City of Dallas permit was filed June 26, 2026.
Summarized from City of Dallas records · updated Jun 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 26, 2026
- since Jun 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 315 N Montclair Ave
What is happening at 315 N Montclair Ave?
A City of Dallas residential mechanical permit indicates a complete 3-ton gas HVAC system is being replaced.
What work does the permit cover?
Permit RES-MEC-26-003263 covers replacement of a complete 3-ton gas HVAC system.
When was the HVAC permit filed?
The permit was filed June 26, 2026.
Is a new home being built at 315 N Montclair Ave?
The listed permit is for HVAC replacement, not new home construction.
How much will the HVAC replacement cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 75208- 311 N Montclair AveNov 21, 2025Install concord/single/3.5t/gas/hor · 4 m away
- 307 N Montclair AveSep 18, 2025Replacing the condenser coil and air handler unit · 7 m away
- 303 N Montclair AveJan 22, 2026Drain repair · 11 m away
- 318 N Montclair AveAug 4, 2026Exterior repaint of existing historic residence per approved certificate of appropriateness. work includes preparation, primer as needed, and repainting of existing exterior painted surfaces only. no changes to building materials, windows, doors, roof, or architectural details · 13 m away
- 223 N Montclair AveJan 30, 2026Replace (1) hvac system · 81 m away
- 217 N Montclair AveOct 15, 2025Electrical work for addition · 86 m away
- 213 N Montclair AveNov 16, 2020Remove existing roof and install new roof · 90 m away
- 411 N Montclair AveNov 14, 2025411 n montclair reset reshim 1371sqft to stabilize foundation · 95 m away
- 201 N Montclair AveApr 28, 2026Bathroom exhaust fan install · 101 m away
- 311 N Windomere AveJul 1, 2026Replace sewer main · 115 m away
- 303 N Windomere AveSep 4, 2026New install · 116 m away
- 221 N Windomere AveMay 16, 2025Replacing existing u/s full system · 142 m away