800 W 8th St
Dallas, TX 75208
Remodel permits filed for six apartments at 800 W 8th St
City of Dallas permits indicate work to remodel six multifamily dwelling units at 800 W 8th St. Mechanical permits filed October 22, 2025, cover installation of six 2-ton HVAC systems, and an electrical permit filed November 13, 2025, covers the unit remodels.
Summarized from City of Dallas records · updated Nov 13, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Nov 13, 2025
- since Oct 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 800 W 8th St
What is being built at 800 W 8th St, Dallas?
City of Dallas permits indicate a remodel of six multifamily dwelling units, along with installation of six 2-ton HVAC systems.
When were permits filed for 800 W 8th St?
Mechanical permits COM-MEC-25-001029 and COM-MEC-25-001030 were filed October 22, 2025. Electrical permit COM-ELC-25-002744 was filed November 13, 2025.
Is 800 W 8th St a new apartment building?
The permits describe remodeling six multifamily dwelling units and installing HVAC systems. They do not describe construction of a new apartment building.
What HVAC work is planned at 800 W 8th St?
Two City of Dallas mechanical permits filed October 22, 2025, describe installation of six 2-ton HVAC systems.
What's being remodeled near Cityvet - Bishop Arts?
At 800 W 8th St, City of Dallas permits indicate a remodel of six multifamily dwelling units. The address is about 167 meters from Cityvet - Bishop Arts at 803 W Davis St.
Also being built nearby
All of 75208- 804 W 8th StDec 23, 2025I am replacing an old, worn-out chain-link fence with a new 8ft cedar wood fence on the back side and rear of the property. the upgrade is intended to improve both privacy and aesthetics, and the new fence will remain within our property boundaries · 6 m away
- 815 W 8th StOct 28, 2020Gas relay or repair with test · 26 m away
- 828 W 8th StSep 18, 2025Kitchen and bathrooms remodel · 45 m away
- 833 W 8th StNov 10, 2025Gas test for release · 53 m away
- 836 W 8th StDec 4, 2025Our plumber will have the gas gauge on the unit fully pressurized and ready for the city inspector that is sent out. city of dallas is needed to perform an inspection so that atmos will release the gas utilities back to this property · 58 m away
- 801 Melba StJul 6, 2026I am going to hand-dig a trench 25 feet long and 24 inches deep from the meter to the house. i will remove the old pipe and install the new one, connecting it directly to the line leading to the water heater. finally, i will cap off the old pipe and ensure there are no leaks. after the inspection, i will backfill the trench · 79 m away
- 829 Melba StJul 8, 2025Tankless water-heater replacement · 91 m away
- 820 Melba StSep 15, 2026Electrical for detached storage · 97 m away
- 804 W 7th StJan 22, 2026Gas meter was relocated, it need to be connected · 97 m away
- 816 W 7th StNov 2, 2026Demolition of existing home to build new construction duplex · 101 m away
- 820 W 7th StMay 28, 2026Reroof main house · 102 m away
- 832 W 7th StJun 11, 2025Replacing old driveway and will touch the sidewalk and drive approach · 110 m away