829 Melba St
Dallas, TX 75208
829 Melba St: 1 project on record
City of Dallas lists 1 filing across 1 project at 829 Melba St, Dallas, TX 75208. The most recent, filed July 8, 2025, covers: “Tankless water-heater replacement”.
Compiled from City of Dallas records · updated Jul 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 8, 2025
- since Jul 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 829 Melba St
What is being built at 829 Melba St?
The latest filing (City of Dallas permit RES-PLM-25-002222, July 8, 2025) covers tankless water-heater replacement.
How many permits and filings does 829 Melba St have?
1 filing across 1 project, from July 8, 2025 to July 8, 2025.
Is there other construction near 829 Melba St?
Yes. Nearby filings include 820 Melba St (electrical for detached storage, Sep 15, 2026); 801 Melba St (i am going to hand-dig a trench 25 feet long and 24 inches deep from the meter to the house. i will remove the old pipe and install the new one, connecting it directly to the line leading to the water heater. finally, i will cap off the old pipe and ensure there are no leaks. after the inspection, i will backfill the trench, Jul 6, 2026); 828 W 8th St (kitchen and bathrooms remodel, Sep 18, 2025).
How do I get alerts for new permits at 829 Melba St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 820 Melba StSep 15, 2026Electrical for detached storage · 18 m away
- 801 Melba StJul 6, 2026I am going to hand-dig a trench 25 feet long and 24 inches deep from the meter to the house. i will remove the old pipe and install the new one, connecting it directly to the line leading to the water heater. finally, i will cap off the old pipe and ensure there are no leaks. after the inspection, i will backfill the trench · 45 m away
- 828 W 8th StSep 18, 2025Kitchen and bathrooms remodel · 79 m away
- 836 W 8th StDec 4, 2025Our plumber will have the gas gauge on the unit fully pressurized and ready for the city inspector that is sent out. city of dallas is needed to perform an inspection so that atmos will release the gas utilities back to this property · 80 m away
- 804 W 8th StDec 23, 2025I am replacing an old, worn-out chain-link fence with a new 8ft cedar wood fence on the back side and rear of the property. the upgrade is intended to improve both privacy and aesthetics, and the new fence will remain within our property boundaries · 88 m away
- 800 W 8th StNov 13, 2025Remodel 6 multifamily dwelling units · 91 m away
- 833 W 8th StNov 10, 2025Gas test for release · 92 m away
- 815 W 8th StOct 28, 2020Gas relay or repair with test · 95 m away
- 813 W 9th StSep 24, 2020Replace or modify existing hvac · 96 m away
- 876 W 9th StMar 24, 2026Not a school project demolition of trinity basin prep school building only to grade. this will be a demolition to grade no site demolition will be completed under this permit. parking lot to remain · 131 m away
- 416 N Tyler StSep 30, 2020Gas test · 155 m away
- 407 N Tyler StNov 10, 2026Need a clean and show permit only - no work to be done · 159 m away