3225 Martin Luther King Jr. Blvd
Dallas, TX 75210 · C World LLC
Existing MLK building converted into office suites
An existing single-story building at 3225 Martin Luther King Jr. Blvd. was registered for renovation into office suites, with the initial project filing dated July 21, 2023. A follow-up filing dated February 21, 2024, covered the finish-out of three tenant office suites; the project registration lists an estimated cost of $2 million.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 21, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 21, 2024
- since Feb 21, 2024
- Largest scope
- 4,837 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
CompletedVista MLK Office Suites
4,837 sq ft · $350K est.
- RegisteredFeb 21, 2024
- Plan review
- ConstructionFeb '24 – May '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsContinued alteration of an (existing single story) office building, into a new office suites building. finish-out of (3) tenant office suites — 3225 mlk jr. blvd. office suites
TDLR project registrationRenovation/AlterationProject Closed4,837 sq ft$350K est.- Project #
- TABS2024012083
- Tenant / owner
- Vista Mlk Office Suites
- Design firm
- Pro
- Contact
- Pro
Alteration of an (existing single story) abandoned social security office, into a new office suites building. the first tenant suite will be a vista bank branch location (ste.100) with a financial literacy training room (ste.110). update ada parking. — 3225 mlk jr. blvd. office suites
TDLR project registrationRenovation/AlterationProject Closed11,500 sq ft$2.0M est.- Project #
- TABS2023024132
- Tenant / owner
- Vista Mlk Office Suites
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3225 Martin Luther King Jr. Blvd
What is being built at 3225 Martin Luther King Jr. Blvd. in Dallas?
Project filings describe renovations to convert an existing single-story building into office suites. The February 21, 2024, filing covered the finish-out of three tenant office suites.
When was the office project at 3225 MLK permitted?
The initial Texas Department of Licensing and Regulation project registration was filed July 21, 2023. A follow-up registration was filed February 21, 2024.
Is Vista Bank going into 3225 Martin Luther King Jr. Blvd.?
The 2023 project description said the first tenant suite would be a Vista Bank branch, with a financial literacy training room in another suite. The later filing describes the finish-out of three tenant office suites.
How much will the 3225 MLK office renovation cost?
The TDLR registration lists an estimated project cost of $2 million. This is the applicant's estimate, not a reported final cost.
What is being built near Simple Faith International on Pennsylvania Avenue?
At 3225 Martin Luther King Jr. Blvd., about 220 meters from Simple Faith International, project filings describe an existing building being renovated into office suites. The latest filing was dated February 21, 2024.
What is happening near Rocket Philly on Robert B. Cullum Boulevard?
About 286 meters from Rocket Philly, an existing single-story building at 3225 Martin Luther King Jr. Blvd. was registered for conversion into office suites. The February 2024 filing covered three tenant-suite finish-outs.
Also being built nearby
All of 75210- 3300 Martin Luther King Jr BlvdSep 12, 2025Exterior renovation to include new signage (under a separate permit), new bollards and very limited building paint. no interior work. no change in occupancy classification and occupant load. no civil, mechanical, electrical, or plumbing under this scope of work · 107 m away
- 3101 Martin Luther King Jr BlvdFeb 26, 2026Relocate and install new duct work · 181 m away
- 3120 South BlvdNov 25, 2020Foundation repair · 192 m away
- 3112 South BlvdJun 12, 2025Gas test · 202 m away
- 3227 Pennsylvania AveJul 28, 2026Demolition existing structure \| 3227 pennsylvania · 218 m away
- 3223 Pennsylvania AveNov 10, 2026Bc el fire the scope of work consists of reusing the existing 11'-0" x 16'-0" concrete pad and extending it to 11'-0" x 22'-0". improvements include the installation of one 12'-0" h-frame, two span panels, four tesla powerwall 3 units, two tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200a meter in the existing meter box, one new meter box with a 200a meter, four nodes, and one ground bar. the project also includes installing conduit runs from the h-frame to the nodes and fiber handholes, with the final quantity of handholes to be determined by the contractor · 218 m away
- 3203 Pennsylvania AveApr 1, 2026“installation of plumbing systems for a new commercial building, including domestic water distribution and sanitary wastewater piping throughout the structure. work includes connection to approved water and wastewater services per city of dallas standards and approved plans · 220 m away
- 3203 Pennsylvania Ave · Simple Faith InternationalMar 12, 2025Simple faith international — new construction — new construction of metal pre fabricated church building and parking lot · 220 m away
- 3117 Pennsylvania AveJun 3, 2026New construction _ residential · 280 m away
- 2825 Medill StDec 1, 2025Nsfd · 281 m away
- 2823 Medill StOct 10, 2025Nsfaa-new construction sfd · 283 m away
- 1730 Jb Jackson Jr BlvdSep 5, 2025Added additional grounding and surge protector to panel.“ · 285 m away
More offices in 75210.