3112 South Blvd
Dallas, TX 75215
3112 South Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 3112 South Blvd, Dallas, TX 75215. The most recent, filed June 12, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Jun 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 12, 2025
- since Jun 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3112 South Blvd
What is being built at 3112 South Blvd?
The latest filing (City of Dallas permit RES-PLM-25-001344, June 12, 2025) covers gas test.
How many permits and filings does 3112 South Blvd have?
1 filing across 1 project, from June 12, 2025 to June 12, 2025.
What is being built near Dfw International Airport - Dcc Office Trailers in Dallas?
3112 South Blvd is about 171 m from Dfw International Airport - Dcc Office Trailers (3003 South Service Road). Its latest filing is for gas test.
Is there other construction near 3112 South Blvd?
Yes. Nearby filings include 3120 South Blvd (foundation repair, Nov 25, 2020); 3101 Martin Luther King Jr Blvd (relocate and install new duct work, Feb 26, 2026); 3022 South Blvd (replace two water heaters with tank less, Jun 8, 2026).
How do I get alerts for new permits at 3112 South Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 3120 South BlvdNov 25, 2020Foundation repair · 11 m away
- 3101 Martin Luther King Jr BlvdFeb 26, 2026Relocate and install new duct work · 96 m away
- 3022 South BlvdJun 8, 2026Replace two water heaters with tank less · 141 m away
- 3020 South BlvdMar 19, 2026Power turned on, no work · 143 m away
- 2808 Meadow StNov 8, 2026Hvac new build · 167 m away
- 2825 Medill StDec 1, 2025Nsfd · 170 m away
- 3003 South Service Road · Dfw International Airport - Dcc Office TrailersMar 7, 2024Dcc elevated walkways replacement — renovation/alteration — replace approximately 27,000 sq ft of composite decking around office trailers · 171 m away
- 2823 Medill StOct 10, 2025Nsfaa-new construction sfd · 172 m away
- 2800 Meadow StOct 8, 2025Install new electrical · 176 m away
- 3225 Martin Luther King Jr. Blvd · C World LLCFeb 21, 2024Vista mlk office suites — renovation/alteration — continued alteration of an (existing single story) office building, into a new office suites building. finish-out of (3) tenant office suites · 202 m away
- 3000 Martin Luther King Jr BlvdDec 3, 2025Replace 3 heating and 1 domestic boilers · 202 m away
- 3023 Park Row AveOct 8, 2026Building 5b - install new two-way cleanout at the end of the building (exterior)excavate as required to expose existing sewer piping. tunnel beneath units 143, 144, and 145.remove deteriorated sewer piping. install new pvc sewer piping. reconnect sewer system.test and verify proper flow · 230 m away