4150 Martin Luther King Jr Blvd
Dallas, TX 75210
Concession stand plumbing and electrical work at 4150 MLK
City of Dallas permits indicate plumbing and electrical work for concession stands at 4150 Martin Luther King Jr Blvd. The filings include work on three-compartment sinks, gas and backflow connections, and electrical service, with permits filed from August 22, 2025, through September 2, 2026.
Summarized from City of Dallas records · updated Sep 2, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Sep 2, 2026
- since Aug 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsSources: City of Dallas
Questions about 4150 Martin Luther King Jr Blvd
What is being built at 4150 Martin Luther King Jr Blvd?
Dallas permit records show plumbing and electrical work for concession stands, including sink, gas, backflow, and electrical connections. The records do not specify a larger construction project.
Is a new restaurant opening at 4150 Martin Luther King Jr Blvd?
The permits describe work for concession stands and include a plumbing permit whose description mentions Jack’s Breakfast. The records do not confirm a restaurant opening.
When were permits filed for work at 4150 Martin Luther King Jr Blvd?
The earliest filing in the records is dated August 22, 2025, and the latest is dated September 2, 2026.
What kind of plumbing work is planned at 4150 Martin Luther King Jr Blvd?
The permit descriptions include three-compartment sinks, gas connections, and backflow work. Plumbing permits were filed August 28 and September 3, 2025, and August 25 and September 2, 2026.
What electrical work is planned at 4150 Martin Luther King Jr Blvd?
Electrical permits describe connecting power to concession stands or booths. The filings are dated August 22 and September 2, 2025, and August 17 and August 27, 2026.
Also being built nearby
All of 75210- 4000 Martin Luther King Jr BlvdSep 2, 2026Mlk 27a f - install electrical to concession - dippin dots cart · 36 m away
- 1335 Admiral Nimitz CirNov 13, 2026Horizontal metal truss will be held up by and attached to two vertical metal scaffolds that are 163" in height. the scaffolds will each be weighted by 3 500 lb water barrels. there will be race branding on the outside of the structure. runners will pass under this arch as they finish their race · 53 m away
- 1438 Coliseum DrSep 16, 2026Install pedstrian walk-over bridge · 62 m away
- 4100 Martin Luther King Jr BlvdSep 22, 2026Mlk 31f - install stage truss & banners · 76 m away
- 4141 Martin Luther King Jr BlvdMar 20, 2026Gas test · 76 m away
- 3900 Martin Luther King Jr BlvdSep 22, 2026Mlk 18 f - hook up all drains and water lines and gas to fixtures · 87 m away
- 1400 Coliseum DrSep 21, 2026C-35af coliseum bottled water · 88 m away
- 1300 Admiral Nimitz CirSep 15, 2026N 19 f winfield burgers install gas, water, drain and rpz · 131 m away
- 1401 Coliseum DrSep 22, 2026C 5f - install truss for banners · 134 m away
- 1403 Washington StAug 29, 2025Bcc 1f 1403 washington st wiring concession stand (briscoe-carpenter) tom's · 148 m away
- 3750 Cotton Bowl PlzSep 9, 2025No scope of work · 175 m away
- 1420 Washington StSep 4, 2026Connect electrical service · 176 m away