4100 Martin Luther King Jr Blvd
Dallas, TX 75210
Concession hookups and stage truss work at 4100 MLK
City of Dallas permits indicate concession-related plumbing and electrical work, plus stage truss and banner installation, at 4100 Martin Luther King Jr Blvd. The filings run from September 13, 2025, through September 22, 2026; they do not identify a new building or tenant.
Summarized from City of Dallas records · updated Sep 22, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Sep 22, 2026
- since Sep 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 4100 Martin Luther King Jr Blvd
What is being built at 4100 Martin Luther King Jr Blvd?
Dallas permits indicate concession-related plumbing and electrical work and the installation of a stage truss and banners. The records do not describe a new building.
What work is planned at 4100 Martin Luther King Jr Blvd?
Permit descriptions list concession electrical work, plumbing for sinks and gas, and stage truss and banner installation. The latest listed filing is permit COM-ALT-ADD-26-002315, dated September 22, 2026.
When were permits filed for 4100 Martin Luther King Jr Blvd?
The records span September 13, 2025, to September 22, 2026. They include plumbing permit COM-PLM-25-001748 and alteration/addition permit COM-ALT-ADD-26-002315.
Is a new restaurant opening at 4100 Martin Luther King Jr Blvd?
The permits list concession-related plumbing and electrical work, but do not identify a restaurant or tenant. They do not confirm a new opening.
What does permit COM-ELC-26-004468 cover?
The City of Dallas permit description says it covers electrical work for a concession at 4100 Martin Luther King Jr Blvd. It is dated September 8, 2026.
What does permit COM-ALT-ADD-26-002315 cover?
Its description says “install stage truss & banners” at the location. The permit is dated September 22, 2026.
Also being built nearby
All of 75210- 4141 Martin Luther King Jr BlvdMar 20, 2026Gas test · 40 m away
- 4150 Martin Luther King Jr BlvdSep 2, 2026Cet 4 f - 4150 martin luther king jr. blvd. jack’s breakfast - jack - 3 comp sink backflow · 76 m away
- 1335 Admiral Nimitz CirNov 13, 2026Horizontal metal truss will be held up by and attached to two vertical metal scaffolds that are 163" in height. the scaffolds will each be weighted by 3 500 lb water barrels. there will be race branding on the outside of the structure. runners will pass under this arch as they finish their race · 88 m away
- 1403 Washington StAug 29, 2025Bcc 1f 1403 washington st wiring concession stand (briscoe-carpenter) tom's · 99 m away
- 4000 Martin Luther King Jr BlvdSep 2, 2026Mlk 27a f - install electrical to concession - dippin dots cart · 105 m away
- 1420 Washington StSep 4, 2026Connect electrical service · 117 m away
- 1300 Admiral Nimitz CirSep 15, 2026N 19 f winfield burgers install gas, water, drain and rpz · 120 m away
- 1438 Coliseum DrSep 16, 2026Install pedstrian walk-over bridge · 126 m away
- 3900 Martin Luther King Jr BlvdSep 22, 2026Mlk 18 f - hook up all drains and water lines and gas to fixtures · 162 m away
- 1400 Coliseum DrSep 21, 2026C-35af coliseum bottled water · 163 m away
- 1243 Admiral Nimitz CirSep 21, 2026Map plat # n-15 cf - entrance portal, video screen, & tv's · 170 m away
- 1500 Coliseum DrAug 20, 2025C25 - hip hop - connect electrical to ride · 180 m away