1500 Coliseum Dr
Dallas, TX 75210
Electrical connection for a ride permitted at 1500 Coliseum Dr
A City of Dallas permit indicates electrical work to connect power to a ride at 1500 Coliseum Dr. The commercial electrical permit was filed August 20, 2025, under permit COM-ELC-25-001565.
Summarized from City of Dallas records · updated Aug 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 20, 2025
- since Aug 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1500 Coliseum Dr
What work is permitted at 1500 Coliseum Dr?
The permit describes connecting electrical service to a ride. It does not provide further details about the ride.
When was the permit filed for 1500 Coliseum Dr?
The City of Dallas permit was filed August 20, 2025.
What is the permit number for work at 1500 Coliseum Dr?
The permit number is COM-ELC-25-001565.
Is a new ride being built at 1500 Coliseum Dr?
The permit describes electrical work to connect to a ride, but it does not say whether the ride itself is new.
What is being built near Little Lonestars Area Redevelopment?
At 1500 Coliseum Dr, about 209 meters from Little Lonestars Area Redevelopment, a City of Dallas permit indicates electrical work to connect power to a ride.
Also being built nearby
All of 75210- 1327 Admiral Nimitz CirAug 27, 2026N 18b f - install electrical to concession · 16 m away
- 1243 Admiral Nimitz CirSep 21, 2026Map plat # n-15 cf - entrance portal, video screen, & tv's · 35 m away
- 1300 Admiral Nimitz CirSep 15, 2026N 19 f winfield burgers install gas, water, drain and rpz · 66 m away
- 1200 Admiral Nimitz CirSep 15, 2026N 15 f francho fajitas install gas , water, drain, and rpz for concession stand · 94 m away
- 3750 Cotton Bowl PlzSep 9, 2025No scope of work · 126 m away
- 3939 Grand AveSep 18, 2026Installation of a temporary 30' x 20' x 18' high truss exhibit structure for the corona beach club activation at the 2026 state fair of texas park, booth lbs-2-s. structure will be installed by sync marketing and inspected prior to use · 137 m away
- 1335 Admiral Nimitz CirNov 13, 2026Horizontal metal truss will be held up by and attached to two vertical metal scaffolds that are 163" in height. the scaffolds will each be weighted by 3 500 lb water barrels. there will be race branding on the outside of the structure. runners will pass under this arch as they finish their race · 148 m away
- 3929 Grand AveJan 7, 2026Will repair the gas lines at the centennial by replacing a few feet of pipe, installing new fittings, and using a 40-ft lift to access the gas lines.note: building is vacant · 156 m away
- 4100 Martin Luther King Jr BlvdSep 22, 2026Mlk 31f - install stage truss & banners · 180 m away
- 4000 Martin Luther King Jr BlvdSep 2, 2026Mlk 27a f - install electrical to concession - dippin dots cart · 189 m away
- 4212 East Grand AveFeb 24, 2026Dsst installation of 3 new outdoor pergola structures for the after8toeducate facility. each new pergola is to be 28' long x 7' wide x 8' tall. new pergola posts to be set in concrete footers · 192 m away
- 4150 Martin Luther King Jr BlvdSep 2, 2026Cet 4 f - 4150 martin luther king jr. blvd. jack’s breakfast - jack - 3 comp sink backflow · 197 m away