2519 Alco Ave
Dallas, TX 75211
Electrical upgrades permitted at 2519 Alco Ave
A residential electrical permit at 2519 Alco Ave covers replacing a 200-amp panel, grounding, surge protection and a whole-home rewire. The City of Dallas record was filed January 20, 2026.
Summarized from City of Dallas records · updated Jan 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 20, 2026
- since Jan 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2519 Alco Ave
What work is planned at 2519 Alco Ave?
A City of Dallas residential electrical permit covers a 200-amp panel replacement, grounding, surge protection and a whole-home rewire. The permit is RES-ELC-26-000365.
When was the electrical permit filed for 2519 Alco Ave?
The City of Dallas record shows a filing date of January 20, 2026.
Is the electrical panel being replaced at 2519 Alco Ave?
Yes. The permit description includes replacing a 200-amp panel.
Does the permit for 2519 Alco Ave include a whole-house rewire?
Yes. The description specifies a whole-home rewire, along with grounding and surge protection.
What is the permit number for work at 2519 Alco Ave?
The City of Dallas residential electrical permit number is RES-ELC-26-000365, filed January 20, 2026.
Also being built nearby
All of 75211- 2523 Alco AveSep 25, 2025Gas line relay in backyard from meter to house · 6 m away
- 2533 Alco AveAug 17, 2026Remove and replace existing wood fence with 8' tall cedar board on board with metal posts set up to 3' deep in concrete, pressure treated base board, 1 walk gate and 1 manual (non-electric) swing gate on right front of house next to walk through gate · 22 m away
- 2519 Marvin AveJan 25, 2021Replace or modify existing hvac · 98 m away
- 2503 Marvin AveMar 9, 2026Remove and replace shingles · 99 m away
- 2523 Marvin AveOct 30, 2026Whole house gas repipe and gas yard line install · 99 m away
- 2442 Alco AveSep 22, 2026Mcr with battery install 33 panels roof mounted pv solar system \| install a battery - disconnect/reconnect needed · 110 m away
- 2532 Marvin AveMar 3, 2026Mcr with battery 31 module, 11.315kw roof mounted solar system; 2 franklin home power solution battery 10 kw (15 kwh) apower 2 [240v] · 115 m away
- 2430 Alco AveNov 10, 2025Bringing electrical wiring on the 1st floor of my house up to code. this is due to an electrical outlet that was smoldering due to original 1936 wiring · 124 m away
- 2426 Alco AveNov 6, 2020Addition to sfd · 129 m away
- 2427 Alco AveApr 20, 2026Upgrading electrical service panel and meter · 136 m away
- 2615 Alco AveJun 8, 2026Reroof · 152 m away
- 2614 Alco AveAug 12, 2025We will perform sewer line camera inspection before starting the project.we will install 17 concrete piers around the house.we will install 13 pads and blocks underneath the house to support and reinforcewe will install steel shims for the existing pads underneath the house and more steel shims to the new piersand blocks&pads.company responsible to level the house per engineer plan · 153 m away