2634 Alco Ave
Dallas, TX 75211
2634 Alco Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 2634 Alco Ave, Dallas, TX 75211. The most recent, filed October 22, 2020, covers: “Addition of detached garage”.
Compiled from City of Dallas records · updated Oct 22, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Oct 22, 2020
- since Oct 22, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2634 Alco Ave
What is being built at 2634 Alco Ave?
The latest filing (City of Dallas permit 2009232001, October 22, 2020) covers addition of detached garage.
How many permits and filings does 2634 Alco Ave have?
2 filings across 2 projects, from October 22, 2020 to October 22, 2020.
Is there other construction near 2634 Alco Ave?
Yes. Nearby filings include 2638 Alco Ave (electrical remodel, Jan 8, 2021); 2623 Alco Ave (adding one full bathroom with one toilet, one sink and one shower. also adding a washer, Nov 5, 2026); 2614 Alco Ave (we will perform sewer line camera inspection before starting the project.we will install 17 concrete piers around the house.we will install 13 pads and blocks underneath the house to support and reinforcewe will install steel shims for the existing pads underneath the house and more steel shims to the new piersand blocks&pads.company responsible to level the house per engineer plan, Aug 12, 2025).
How do I get alerts for new permits at 2634 Alco Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75211- 2638 Alco AveJan 8, 2021Electrical remodel · 6 m away
- 2623 Alco AveNov 5, 2026Adding one full bathroom with one toilet, one sink and one shower. also adding a washer · 23 m away
- 2614 Alco AveAug 12, 2025We will perform sewer line camera inspection before starting the project.we will install 17 concrete piers around the house.we will install 13 pads and blocks underneath the house to support and reinforcewe will install steel shims for the existing pads underneath the house and more steel shims to the new piersand blocks&pads.company responsible to level the house per engineer plan · 31 m away
- 2615 Alco AveJun 8, 2026Reroof · 34 m away
- 2631 Marvin AveSep 16, 2025Install 40 gallon gas water heater · 95 m away
- 2611 Marvin AveSep 11, 2020Replace or modify existing hvac · 101 m away
- 2603 Marvin AveNov 7, 2025Replacing one package unit for downstairs with a new package unit. replacing upstairs unit outdoor and indoor unit · 106 m away
- 2606 Marvin AveJul 29, 202580' of 8 foot cedar steel posts 1 walk gate · 116 m away
- 2602 Marvin AveOct 15, 2020Install water heater · 118 m away
- 2627 W Jefferson BlvdNov 18, 2026Gas test · 149 m away
- 2704 Alco AveJan 25, 2021Remove existing roof and install new roof · 156 m away
- 2533 Alco AveAug 17, 2026Remove and replace existing wood fence with 8' tall cedar board on board with metal posts set up to 3' deep in concrete, pressure treated base board, 1 walk gate and 1 manual (non-electric) swing gate on right front of house next to walk through gate · 162 m away