2738 Sharon St
Dallas, TX 75211
Room addition permitted at 2738 Sharon St
Permits indicate a room addition to the existing home at 2738 Sharon St, including enclosing an open porch, was filed on April 22, 2026. Later permits cover plumbing for the addition, electrical work and new HVAC equipment.
Summarized from City of Dallas records · updated Aug 6, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 6, 2026
- since Apr 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 2738 Sharon St
What is being built at 2738 Sharon St in Dallas?
City of Dallas records describe a room addition to the existing home and the enclosure of an open porch. The alteration and addition permit was filed April 22, 2026, under permit RES-ALT-ADD-26-000610.
When was the addition at 2738 Sharon St permitted?
The alteration and addition permit was filed April 22, 2026. Related plumbing, electrical and mechanical permits were filed May 20, July 30 and August 6, 2026.
Is 2738 Sharon St getting a new home or an addition?
The permit describes an addition to an existing home, not a new home. It calls for a room addition at the back and enclosing an open porch.
What other work is permitted at 2738 Sharon St?
Related permits cover plumbing associated with the addition, electrical work for it and new HVAC equipment. The records were filed between May 20 and August 6, 2026.
What is permit RES-ALT-ADD-26-000610 for?
The City of Dallas permit filed April 22, 2026, describes a room addition at the back of the existing home and enclosure of an open porch.
Also being built nearby
All of 75211- 2751 Sharon StAug 19, 2025Water heater replacement · 31 m away
- 2711 Sharon StAug 26, 2026What we do is come and replace the old meter base and add in a riser above the roof line. after that we would put in a new panel under the meter and run all the existing wiring into the new panel with new breakers. we would install 2 ground rods, a cold water ground and an inner system bonding bar as well as a surge protector · 67 m away
- 2723 Wilton AveMay 20, 2025Replace service panel · 96 m away
- 2734 Wilton AveFeb 5, 2026X sister 24 lf of existing 2x6 beam.x remove debris from the crawlspace.x reset/re-shim the foundation with steel shims.x add downspout extensions to the current guttering system · 105 m away
- 2726 Grafton AveNov 5, 2025Remodel plumbing (replacing cast iron with pvc) · 109 m away
- 2722 Grafton AveMar 26, 2026Replace section of gas line · 112 m away
- 2715 Grafton AveOct 9, 2025The house has 2 rooms and 1 bathroom on 776 sq fts; we want to add 627 sq fts, that way the house is going to be 3 bedrooms and 2 bathrooms · 132 m away
- 2723 Bentley AveMay 28, 2025Gas test · 193 m away
- 2818 Sharon StOct 29, 2025Replace riser service entrance · 198 m away
- 2707 Bentley AveOct 20, 20252707 bentley install 10 concrete pilings to stabilize foundation · 199 m away
- 2750 Bentley AveApr 8, 2026Service, meter and panel replacement · 209 m away
- 2706 Bentley AveOct 26, 2026Install all new plumbing · 211 m away