Recent · latest filing Jul 2025Residential
2910 Lourdes St
Dallas, TX 75211
2910 Lourdes St: 1 project on record
City of Dallas lists 1 filing across 1 project at 2910 Lourdes St, Dallas, TX 75211. The most recent, filed July 8, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Jul 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 8, 2025
- since Jul 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2910 Lourdes St
What is being built at 2910 Lourdes St?
The latest filing (City of Dallas permit RES-PLM-25-002233, July 8, 2025) covers gas test.
How many permits and filings does 2910 Lourdes St have?
1 filing across 1 project, from July 8, 2025 to July 8, 2025.
Is there other construction near 2910 Lourdes St?
Yes. Nearby filings include 3011 Lourdes St (gas test, Dec 15, 2020); 2912 W Colorado Blvd (remove and replace asphalt shingles, Nov 12, 2026); 2909 W Colorado Blvd (sewer relay, Sep 29, 2020).
How do I get alerts for new permits at 2910 Lourdes St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75211- 3011 Lourdes StDec 15, 2020Gas test · 115 m away
- 2912 W Colorado BlvdNov 12, 2026Remove and replace asphalt shingles · 116 m away
- 2909 W Colorado BlvdSep 29, 2020Sewer relay · 129 m away
- 2835 W Colorado BlvdNov 13, 2025Gas test · 177 m away
- 2831 W Colorado BlvdJan 15, 2026Andrew civetti- installing a 17.63 kw pv solar system, 2 tesla pw3, and a span · 182 m away
- 2804 W Colorado BlvdMar 30, 2026Pier and beam sewer repipe · 203 m away
- 2916 Touraine DrOct 23, 2026Replace existing damage electrical feeders wires in the meter base box to over head.only meter wires. tree felt over · 220 m away
- 3112 Lourdes StApr 28, 2026Gas test · 231 m away
- 1254 Moulin Rouge DrDec 3, 2025Install electrical service for a charter power supply cabinet · 239 m away
- 1251 Moulin Rouge DrOct 31, 2026Building 8tear off existing wood shake roofing system to open framing. install new code-compliant roof decking to create a solid substrate. install synthetic underlayment over entire roof area. install drip edge at eaves and rakes. replace all flashings, including valleys, wall flashings, and pipe penetrations. install 30-year composition shingles in accordance with manufacturer specifications and local building codes. all work to comply with applicable municipal codes and ordinances. remove and properly dispose of all roofing debris · 248 m away
- 1239 Hartsdale DrAug 5, 2026Installing new service equipment and circuitry to supply power to mini-split ac units on the exterior of each apartment. no interior work will be done with our scope of work. (2) existing services will be used, and oncor has provided (2) new services as well · 248 m away
- 3105 W Colorado BlvdFeb 11, 2026Install new plumbing for bathroom addition · 263 m away