312 N Gilpin Ave
Dallas, TX 75211
Sewer line replacements permitted at 312 N Gilpin Ave
Commercial plumbing permits indicate sewer line replacements at 312 N Gilpin Ave, including work beneath the building and in several units. The City of Dallas records are dated August 15, 2025.
Summarized from City of Dallas records · updated Aug 15, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Aug 15, 2025
- since Oct 23, 2020
- Largest scope
- —
- Listed value
- $15
- partial · often understated
Permit & project history
6 projectsSewer line replacements at 2” branch and 4” main location: building 1 / units 103 thru 106__________________• shut off the building’s water supply to prevent accidental flushing of debris or waste during the course of the work.• remove and repair up to 50 linear feet between units 103 through 106, main sewer line is 4-inch and 2-inch branch lines. • repair with new pvc pipes, pvc fittings and ct adapters were needed.• level on new pipe with strap or hangers for proper flow.• check for proper flow and leaks.*note:- this does not include any sewage water removal repairs - j national is not responsible for any tension cables or utilities
Sewer line replacements at 2” branch and 4” main location: building 1 / units 103 thru 106__________________• shut off the building’s water supply to prevent accidental flushing of debris or waste during the course of the work.• remove and repair up to 50 linear feet between units 103 through 106, main sewer line is 4-inch and 2-inch branch lines. • repair with new pvc pipes, pvc fittings and ct adapters were needed.• level on new pipe with strap or hangers for proper flow.• check for proper flow and leaks.*note:- this does not include any sewage water removal repairs - j national is not responsible for any tension cables or utilities
City of Dallas permitCommercial Plumbing PermitSewer line replacements at 4” main location: building 1 / units 108 thru 109 at basement area under building proposal_______________• shut off the building’s water supply to prevent accidental flushing of debris or waste during the course of the work.• remove and repair up to 35 linear feet between units 108 through 109, main sewer line is 4-inch.• repair with new pvc pipes, pvc fittings and ct adapters were needed.• level on new pipe with strap or hangers for proper flow.• check for proper flow and leaks.*note:- this does not include any sewage water removal repairs - j national is not responsible for any tension cables or utilities
Sewer line replacements at 4” main location: building 1 / units 108 thru 109 at basement area under building proposal_______________• shut off the building’s water supply to prevent accidental flushing of debris or waste during the course of the work.• remove and repair up to 35 linear feet between units 108 through 109, main sewer line is 4-inch.• repair with new pvc pipes, pvc fittings and ct adapters were needed.• level on new pipe with strap or hangers for proper flow.• check for proper flow and leaks.*note:- this does not include any sewage water removal repairs - j national is not responsible for any tension cables or utilities
City of Dallas permitCommercial Plumbing PermitSewer line replacement location: unit 116 under building___________________• gain access to under building at unit 116• excavate under pier beam to expose existing sewer pipe• expose up to 10 linear feet • repair with new pvc pipe • make proper connections with new pvc fittings and ct adapters• level new pipe with cushion sand• check for proper flow and leaks*notes:.- quote does not include any sewage water removal- will run the camera once repair is done to see if there are any other issues at unit 110 through 115. camera was underwater but the issue could be at unit 116 only. the break at this location could be the problem of water in existing sewer pipe.- j national is not responsible for sub flooring repairs. to set up these services, the property will need to contact j national dispatch
Sewer line replacement location: unit 116 under building___________________• gain access to under building at unit 116• excavate under pier beam to expose existing sewer pipe• expose up to 10 linear feet • repair with new pvc pipe • make proper connections with new pvc fittings and ct adapters• level new pipe with cushion sand• check for proper flow and leaks*notes:.- quote does not include any sewage water removal- will run the camera once repair is done to see if there are any other issues at unit 110 through 115. camera was underwater but the issue could be at unit 116 only. the break at this location could be the problem of water in existing sewer pipe.- j national is not responsible for sub flooring repairs. to set up these services, the property will need to contact j national dispatch
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 312 N Gilpin Ave
What work is permitted at 312 N Gilpin Ave?
City of Dallas permits describe sewer line replacements in several locations, including beneath the building and near units 103–109 and 116. The permits are dated August 15, 2025.
When were the sewer repairs at 312 N Gilpin Ave permitted?
The three commercial plumbing permits are dated August 15, 2025.
Which units are included in the sewer work at 312 N Gilpin Ave?
The permit descriptions identify work between units 103–106, between units 108–109, and beneath unit 116.
How much sewer pipe will be replaced at 312 N Gilpin Ave?
The permits describe repairs of up to 50 linear feet between units 103–106, up to 35 feet between units 108–109, and up to 10 feet beneath unit 116.
What materials are specified for the sewer line repairs?
The permit descriptions specify new PVC pipes and fittings for the repairs.
What are the permit numbers for the plumbing work at 312 N Gilpin Ave?
The City of Dallas permits are COM-PLM-25-001027, COM-PLM-25-001023, and COM-PLM-25-001021, all dated August 15, 2025.
Also being built nearby
All of 75211- 3809 Dismount StAug 10, 2026Gas test, repair replacement · 105 m away
- 3811 Mt Everest StDec 18, 2025Mcr pv instalattion of:50x430 jinko solar jkm430n-54hl4r-b modulesroof mounted solar photovoltaic modulessystem size: 21.500 kw dc stcsystem size: 16.000 kw ac · 110 m away
- 3815 Mt Everest StOct 22, 2025Remove old roof shingles and reroof house with new roof shingles · 113 m away
- 3827 Dismount StNov 5, 2026A.o. smith signature 100 40-gallons tall 6-year warranty 35500-btu natural gas water heater replacement like-for-like · 135 m away
- 3844 Mt Ranier StNov 10, 2026Relocate gas meter · 145 m away
- 3834 Dismount StAug 9, 2026Electric service upgrade · 146 m away
- 3848 Mt Ranier StSep 11, 2026Relocate gas meter · 152 m away
- 3850 Mt Ranier StSep 11, 2026Relocate gas meter · 155 m away
- 3823 Mt Royal StMay 6, 2026Adding a new drive approach to the residential area. it would measure 10x6 ft · 218 m away
- 3723 Mt Royal StApr 27, 2026Gas test · 231 m away
- 211 N Albrook StJul 8, 2025Gas test with release · 249 m away
- 3914 Dismount StAug 11, 2025Gas system replacement · 266 m away