4510 W Jefferson Blvd
Dallas, TX 75211 · Dallas ISD
Secure entrance and marquee sign planned at Celestino Soto Jr. ES
A renovation at Celestino Mauricion Soto Jr. ES includes a new secure vestibule and reception area, changes to existing mechanical, electrical and plumbing systems, and a new marquee sign. The project was registered and permitted on August 31, 2026. The TDLR registration lists 981 square feet and an applicant-estimated project cost of $315,944.
Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Aug 31, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 31, 2026
- since Aug 31, 2026
- Largest scope
- 981 sf
- Estimated cost
- $316K
- state registration
Where this project stands
In state plan reviewCelestino Mauricion Soto Jr. ES
981 sq ft · $316K est.
- RegisteredAug 31, 2026
- Plan reviewnow
- ConstructionOct '26 – Apr '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsRenovation to existing entry vestibule and new marquee sign. — celestino mauricion soto jr. es
TDLR project registrationRenovation/AlterationProject Registered981 sq ft$316K est.- Project #
- TABS2026029254
- Tenant / owner
- Celestino Mauricion Soto Jr. Es
- Design firm
- Pro
- Contact
- Pro
Dsst disd celestino mauricio soto jr es ,new secure vestibule, including cameras, card access readers, and door contacts, modifications in existing mep system and associated controls as part of new secure vestibule/reception area. new marquee sign
Dsst disd celestino mauricio soto jr es ,new secure vestibule, including cameras, card access readers, and door contacts, modifications in existing mep system and associated controls as part of new secure vestibule/reception area. new marquee sign
City of Dallas permitCommercial Alteration Addition Permit
Sources: Texas Department of Licensing and Regulation · City of Dallas
Questions about 4510 W Jefferson Blvd
What is being built at 4510 W Jefferson Blvd?
Permits describe a renovated entry vestibule and reception area, including a new secure vestibule and marquee sign. The City of Dallas permit also lists cameras, card access readers and door contacts.
Is a new school being built at 4510 W Jefferson Blvd?
The records describe alterations to the existing Celestino Mauricion Soto Jr. ES, not construction of a new school. The work includes a secure vestibule and a new marquee sign.
When was the Celestino Soto Jr. ES renovation permitted?
The TDLR project registration and City of Dallas permit are both dated August 31, 2026. The city permit number is COM-ALT-ADD-26-002122.
How much will the Celestino Soto Jr. ES project cost?
The TDLR registration lists an applicant-estimated cost of $315,944. This is an estimate for the project, not a reported final cost.
What security features are included in the vestibule renovation?
The City of Dallas permit lists cameras, card access readers and door contacts for the new secure vestibule and reception area.
What's being renovated near Taylor Farms Breakroom Expansion?
At 4510 W Jefferson Blvd, records describe a secure vestibule and reception-area renovation at Celestino Mauricion Soto Jr. ES, with a new marquee sign. The site is about 287 meters from Taylor Farms Breakroom Expansion at 1001 N Cockrell Hill Rd.
Also being built nearby
All of 75211- 1001 N Cockrell Hill Rd · Taylor Farms Texas INCAug 12, 2026Adding of one dock leveler and door · 287 m away
- 1005 N Cockrell Hill RdSep 10, 2026Demolition roof surface; provide infrared scan of entire roof; remove and replace wet insulation. remove and dispose of single ply membrane for walls and curb flashings. install new roof using 115 mil. reinforced tpo fleece-back membrane (with 60 mil tpo), mechanically fastened to roof deck. install 60 mil tpo flashing at juncture of roof and vertical wall surfaces. secure top of flashing with termination bar and counter flashing. install new sheet metal 24 ga. galvanized iron countreflashing and new coping cap. install new counter flashing at all curbs. reflash all vents, jacks, pipes and penetrations. install new tpo cladded metal pitch pans. install to include lifting mechanical units on wood runnders to install new membrane underneath. reset all unitbs back with new treated 4x4 runners and tpo slip sheet. rework tapered insulation system to correct drainage and improve ponding · 287 m away
- 4560 Via James JacobSep 19, 2025Removing the old roof shingles and replacing with new · 294 m away
- 4554 Via San EduardoSep 19, 2025Removing the old roof shingles and replacing with new · 314 m away
- 4448 Brandon StAug 26, 2025Installation of a 13 modules - roof mounted - 5.330 kw dc, 4.160 kw ac with 1 enpahse iq battery-5p-1p-na (5.0 kwh) and a 200a main panel upgrade · 357 m away
- 4536 Via San AntonioMay 21, 2026Battery energy storage system 01 tesla: powerwall 3 1707000-xx-y 11.5 kw (240v) 01 tesla gateway 3 · 442 m away
- 4470 Marcell AveJan 21, 2026Water heater tankless change-out · 442 m away
- 4448 Marcell AveOct 8, 2026Replace electrical service · 448 m away
- 4444 Marcell AveOct 13, 2026Replace electrical service · 450 m away
- 1231 S Cockrell Hill RdJun 18, 2026Gas test · 487 m away
- 4535 Ginger AveAug 31, 2026New ductwork installation with unit · 532 m away
- 4518 Ginger AveMay 13, 2026Relocate gas meter · 536 m away