5921 W Jefferson Blvd
Dallas, TX 75211
New electrical panel and service permitted at 5921 W Jefferson Blvd
A new electrical panel and service are permitted at 5921 W Jefferson Blvd in Dallas; the permit notes there was no electrical service currently. The City of Dallas permit, COM-ELC-25-000936, was filed July 22, 2025.
Summarized from City of Dallas records · updated Jul 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 22, 2025
- since Jul 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5921 W Jefferson Blvd
What is being built at 5921 W Jefferson Blvd?
A City of Dallas permit describes installation of a new electrical panel and service. It notes there was no service currently.
When was the electrical permit filed for 5921 W Jefferson Blvd?
The permit was filed July 22, 2025. Its number is COM-ELC-25-000936.
Is a new building being constructed at 5921 W Jefferson Blvd?
The record provided is for commercial electrical work: a new panel and electrical service. It does not describe construction of a new building.
What will the property at 5921 W Jefferson Blvd be used for?
The permit does not specify a future use or identify an occupant.
Does the permit say when the work at 5921 W Jefferson Blvd will be completed?
No completion date is listed in the permit record.
Also being built nearby
All of 75211- 5909 W Davis StJan 13, 2026Move combi oven to new location waters and floor sink. install black steel line from fryer to grease tank outside · 190 m away
- 6011 W Davis StOct 17, 2025Installing a backflow preventor · 250 m away
- 712 S Walton Walker BlvdJul 22, 2026Unit replacement of ac1 and 2 / add on of 2 - 2ton mini split unitsac 1 - package unitmake: carriermodel #: 48tced16a2a6a0a0a0serial #: 0214p04629age: 12 yearssize: 15.00 tons ac 2 - package unitmake: tranemodel #: ysd300f4rla03serial #: 141010304dage: 12 yearssize: 25.00 tons nextech proposes to: * furnish and supply like to like package units and 2 - 2 ton mini split systems* permit* tie down details* with crane service lift new unit to roof* set and secure factory supplied curb adaptors for units that require them* install and secure new unit per code* reconnect new unit to existing electrical and drain lines* install new service outlet and disconnect.* install factory supplied hail guards and economizer* connect system to existing ems equipment* reconnect to existing duct work* start unit and verify all operations* clean job site* complete final permit inspection ***exclusions*** * permitting * engineered drawing, if required for permitting * any electrical upgrades not included in normal disconnect and reconnect * any controls upgrades not included in normal disconnect and reconnect * fire/smoke devices and control upgrades required by code * fire alarm inspection * road closure permit, if required * parking fees * security if needed or required. * modifications to walls or structures surrounding the new unit * structural steel work if needed * chill water treatment, or rust prevention. * any roof leaks from exhaust fans * any fines or penalties from the city * any roofing work needed · 298 m away
- 5971 Marine WayAug 17, 20268 feet fence, wood on wood · 323 m away
- 5992 Marine WayNov 12, 2025Repare the electrical service , panel , meter base and riser · 324 m away
- 5996 Marine WayNov 12, 2025Change the meter base and new overhead · 328 m away
- 211 S Army AveJun 26, 2026Rsvp-new residential construction · 339 m away
- 104 S Smith StAug 12, 2025Natural gas was shut off and now needs inspection to be reinstated · 405 m away
- 105 S Merrifield RdJun 5, 2026Nsfaa building a new single family home · 457 m away
- 110 S Ira AveJun 10, 2025Relocate gas meter · 477 m away
- 136 S Merrifield RdSep 22, 2025Gas test · 509 m away
- 5915 Radar WayOct 6, 2025Gas test only · 509 m away