groundranger
Recent · latest filing Aug 2026Commercial

3019 Bickers St

Dallas, TX 75212

Fire-damage repairs and building work at 3019 Bickers St

Dallas permits filed from February through August 2026 indicate repairs to fire- and water-damaged Unit 223, including structural, roof, mechanical, electrical, plumbing and interior work. Other permits cover an HVAC replacement, an electrical remodel and plumbing work in Building 31, Unit 311.

Summarized from City of Dallas records · updated Aug 19, 2026

Projects
11
11 filings
Latest filing
Aug 19, 2026
since Oct 9, 2020
Largest scope
—
Listed value
$89
partial · often understated

Permit & project history

11 projects
  1. Building 31 house meter - service release, no work

    Building 31 house meter - service release, no work

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-003971
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Building 31 unit 311 - 2 bath full gut to include new piping, tub, tub valve and chrome fixtures with toilets

    Building 31 unit 311 - 2 bath full gut to include new piping, tub, tub valve and chrome fixtures with toilets

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001413
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. No work permit

    No work permit

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001561
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Electrical remodel

    Electrical remodel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001417
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. New hvac

    New hvac

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000769
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Mcr 1. structural and framing? replace all fire-damaged structural members and framing components identified in theinspection report.? structural engineer’s design package will be provided by dha; contractor shall implementall specified structural repairs in accordance with engineer’s recommendations.? replace all ceiling joists, studs, sheathing, or structural elements as required to achievesound framing.? restore roof truss system in accordance with engineer’s repair detail.? repair or replace decking and roof sheathing as needed.2. roofing? replace or repair roof decking, trusses, and shingles affected by fire or water damage.? provide underlayment, flashing, drip edges, and all required accessories.? roofing system to be warranted and installed in accordance with manufacturerspecifications and city of dallas code.3. mechanical (hvac)? replace all fire and smoke-damaged ductwork, insulation, air handler, and associatedhvac components.? replace supply and return grilles throughout the unit.? verify full functionality of system upon completion.? all hvac work must be performed under the supervision of a licensed mechanicalcontractor and meet current energy code standards4. electrical? remove all compromised electrical wiring, rough-in, and devices.? provide new wiring, panels, breakers, devices, switches, and receptacles throughout.? replace all light fixtures, trims, and cover plates.? install combination smoke and carbon monoxide detectors per dallas fire code.? upgrade electrical service to meet current nfpa and nec standards, including gfci andafci protection.? work to be completed under a licensed electrician.5. plumbing? inspect and replace all affected vent piping, drains, and water lines as necessary.? verify no cross-contamination or damage from heat exposure.? replace fixtures (toilets, lavatories, tubs, faucets) and drains in all bathrooms and kitchen.? all plumbing work shall comply with the city of dallas plumbing code and be performed bya licensed plumber.6. interior finishes and fixtures (ffe)? replace all interior doors, trims, baseboards, and casings (not salvageable per report).? replace or repair glazing—only 30% deemed salvageable per inspection report.? replace all gypsum wallboard (60% replacement minimum based on 40% salvageablerating).? provide new texture and paint to match dha’s standard heavy orange peel finish on wallsand popcorn texture on ceilings.? replace all flooring materials throughout the unit.? replace all cabinetry, countertops, and shelving—none are salvageable.? replace all major appliances with new dha-specified energy star units (refrigerator,stove, vent hood).? replace all finish fixtures, mirrors, vent fans, towel bars, and light trims.? replace attic and wall insulation (blown insulation not salvageable).? all paint and coatings to be low-voc and approved by dha prior to installation.7. smoke and water remediation? perform comprehensive smoke and soot remediation throughout all areas of unit 223,including structure, mechanical spaces, and surfaces.? perform water damage remediation throughout affected areas.? provide air scrubbing, odor removal, and hepa vacuuming as necessary.? all remediation work must be inspected and approved by dha before new finishes orinsulation are installed.8. site and exterior? clean and pressure wash/acid wash all exterior masonry, fascia, and gutters to removesmoke and soot staining.? restore any exterior components damaged by firefighting operations.? ensure all windows and doors are replaced or repaired to meet energy code and dhastandards

    Mcr 1. structural and framing? replace all fire-damaged structural members and framing components identified in theinspection report.? structural engineer’s design package will be provided by dha; contractor shall implementall specified structural repairs in accordance with engineer’s recommendations.? replace all ceiling joists, studs, sheathing, or structural elements as required to achievesound framing.? restore roof truss system in accordance with engineer’s repair detail.? repair or replace decking and roof sheathing as needed.2. roofing? replace or repair roof decking, trusses, and shingles affected by fire or water damage.? provide underlayment, flashing, drip edges, and all required accessories.? roofing system to be warranted and installed in accordance with manufacturerspecifications and city of dallas code.3. mechanical (hvac)? replace all fire and smoke-damaged ductwork, insulation, air handler, and associatedhvac components.? replace supply and return grilles throughout the unit.? verify full functionality of system upon completion.? all hvac work must be performed under the supervision of a licensed mechanicalcontractor and meet current energy code standards4. electrical? remove all compromised electrical wiring, rough-in, and devices.? provide new wiring, panels, breakers, devices, switches, and receptacles throughout.? replace all light fixtures, trims, and cover plates.? install combination smoke and carbon monoxide detectors per dallas fire code.? upgrade electrical service to meet current nfpa and nec standards, including gfci andafci protection.? work to be completed under a licensed electrician.5. plumbing? inspect and replace all affected vent piping, drains, and water lines as necessary.? verify no cross-contamination or damage from heat exposure.? replace fixtures (toilets, lavatories, tubs, faucets) and drains in all bathrooms and kitchen.? all plumbing work shall comply with the city of dallas plumbing code and be performed bya licensed plumber.6. interior finishes and fixtures (ffe)? replace all interior doors, trims, baseboards, and casings (not salvageable per report).? replace or repair glazing—only 30% deemed salvageable per inspection report.? replace all gypsum wallboard (60% replacement minimum based on 40% salvageablerating).? provide new texture and paint to match dha’s standard heavy orange peel finish on wallsand popcorn texture on ceilings.? replace all flooring materials throughout the unit.? replace all cabinetry, countertops, and shelving—none are salvageable.? replace all major appliances with new dha-specified energy star units (refrigerator,stove, vent hood).? replace all finish fixtures, mirrors, vent fans, towel bars, and light trims.? replace attic and wall insulation (blown insulation not salvageable).? all paint and coatings to be low-voc and approved by dha prior to installation.7. smoke and water remediation? perform comprehensive smoke and soot remediation throughout all areas of unit 223,including structure, mechanical spaces, and surfaces.? perform water damage remediation throughout affected areas.? provide air scrubbing, odor removal, and hepa vacuuming as necessary.? all remediation work must be inspected and approved by dha before new finishes orinsulation are installed.8. site and exterior? clean and pressure wash/acid wash all exterior masonry, fascia, and gutters to removesmoke and soot staining.? restore any exterior components damaged by firefighting operations.? ensure all windows and doors are replaced or repaired to meet energy code and dhastandards

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000364
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Electrical repairs

    Electrical repairs

    City of Dallas permitElectrical (EL) Multi Family Alteration$75
    Record
    2010143083
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Relocate ducts

    Relocate ducts

    City of Dallas permitMechanical (ME) Multi Family Alteration$12
    Record
    2010144007
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Repair fire damage no structural changes

    Repair fire damage no structural changes

    City of Dallas permitBuilding (BU) Multi Family Renovation$2
    Record
    2010021142
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Foundation repair

    Foundation repair

    City of Dallas permitBuilding (BU) Multi Family Renovation$66
    Record
    2005271009
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Service release no work

    Service release no work

    City of Dallas permitElectrical (EW) Multi Family Alteration
    Record
    1911141081
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 3019 Bickers St

What is being built at 3019 Bickers St?

Dallas permits indicate repairs to a fire- and water-damaged unit, along with HVAC, electrical and plumbing work elsewhere at the address. The records do not identify a new building.

Was there a permit for fire-damage repairs at 3019 Bickers St?

Yes. Permit COM-ALT-ADD-26-000364, filed February 25, 2026, describes repairs to Unit 223 after fire and water damage.

What work is planned for Unit 223 at 3019 Bickers St?

The February 25, 2026 alteration permit describes structural and roof repairs, replacement of damaged mechanical, electrical and plumbing components, interior restoration, and smoke and water remediation.

Are there plumbing permits for 3019 Bickers St?

Yes. Permit COM-PLM-26-001413, filed April 14, 2026, covers a full bathroom gut and new piping in Building 31, Unit 311.

Are HVAC or electrical upgrades planned at 3019 Bickers St?

Permits filed March 27 and March 30, 2026, describe new HVAC and an electrical remodel. An August 19 electrical permit is for a house meter service release and says no work.

Also being built nearby

All of 75212

More restaurants in 75212.

Get alerts for 3019 Bickers St