119 S Henderson Ave
Dallas, TX 75214
Permits list a yard sewer line and driveway approach at 119 S Henderson
City of Dallas permits at 119 S Henderson Ave list a sewer line in the yard and work to install a driveway approach. The driveway permit was filed November 11, 2020, and the sewer-line permit was filed June 9, 2025.
Summarized from City of Dallas records · updated Jun 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 9, 2025
- since Nov 11, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 119 S Henderson Ave
What work is permitted at 119 S Henderson Ave?
City of Dallas records list a sewer line in the yard and a driveway approach installation.
When was the sewer-line permit filed at 119 S Henderson Ave?
The sewer-line permit, RES-PLM-25-001152, was filed June 9, 2025.
What is permit RES-PLM-25-001152 for in Dallas?
The City of Dallas permit describes the work as a sewer line in the yard. It was filed at 119 S Henderson Ave on June 9, 2025.
When was the driveway permit filed at 119 S Henderson Ave?
The driveway approach permit, 2011061123, was filed November 11, 2020.
Is a new building planned at 119 S Henderson Ave?
The records provided list permits for a yard sewer line and a driveway approach; they do not identify a new building project.
Also being built nearby
All of 75214- 110 S Henderson AveSep 22, 2025Gas test · 15 m away
- 5306 Columbia AveJan 27, 2021Install water heater · 39 m away
- 5305 East Side AveJun 26, 2026Whole house gas air test · 78 m away
- 5324 East Side AveSep 29, 2026All new plumbing inside of the building. new drains, water lines, and water heaters · 98 m away
- 5207 Columbia AveMay 15, 2026Excavate a tunnel and 4 access holes and replace 154 ft of existing compromised cast iron sewer line under apartment building and approximately 30 ft through trenched through the yard fromm the building to the city sewer tie in. schedule 40 pvc pipe, properly supported from the structure · 108 m away
- 115 S St Mary AveNov 9, 2026Nsfaa new construction of a two-story single-family residence containing approximately 2418 sq ft of conditioned living area and an attached 390 sq ft two-car garage, with four bedrooms, four full bathrooms and one second-floor balconies. work includes site grading and drainage, foundation, structural framing, roofing, exterior finishes, electrical, plumbing, hvac, insulation, interior finishes, driveway, sidewalks, landscaping, and water/sewer connections · 119 m away
- 219 S Henderson AveMay 12, 20268 foot wooden fence with metal posts that cover the whole duplex · 127 m away
- 221 S Henderson AveJan 8, 2026Gas test · 129 m away
- 5200 East Side AveFeb 24, 2026Replace damaged meter base and riser with new meter base, pipe and wire · 156 m away
- 5420 Columbia AveJun 17, 2025Electrical to gate operator · 165 m away
- 5324 Reiger AveSep 13, 2026Commercial new multi-family project consisting of 5, 4 story units with access to the roof · 180 m away
- 5325 Alton AveJun 4, 2026Install 273' of 6' tall 11 gauge chain link fence with 1- 14' wide by 6' tall swing gate · 191 m away