5306 Columbia Ave
Dallas, TX 75214
5306 Columbia Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 5306 Columbia Ave, Dallas, TX 75214. The most recent, filed January 27, 2021, covers: “Install water heater”.
Compiled from City of Dallas records · updated Jan 27, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 27, 2021
- since Jan 27, 2021
- Largest scope
- —
- Listed value
- $6K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 5306 Columbia Ave
What is being built at 5306 Columbia Ave?
The latest filing (City of Dallas permit 2101263062, January 27, 2021) covers install water heater.
How many permits and filings does 5306 Columbia Ave have?
1 filing across 1 project, from January 27, 2021 to January 27, 2021.
How much is the construction at 5306 Columbia Ave worth?
Permits at this address list about $6K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 5306 Columbia Ave?
Yes. Nearby filings include 110 S Henderson Ave (gas test, Sep 22, 2025); 119 S Henderson Ave (sewer line in yard, Jun 9, 2025); 5305 East Side Ave (whole house gas air test, Jun 26, 2026).
How do I get alerts for new permits at 5306 Columbia Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 110 S Henderson AveSep 22, 2025Gas test · 27 m away
- 119 S Henderson AveJun 9, 2025Sewer line in yard · 39 m away
- 5305 East Side AveJun 26, 2026Whole house gas air test · 82 m away
- 5324 East Side AveSep 29, 2026All new plumbing inside of the building. new drains, water lines, and water heaters · 91 m away
- 5420 Columbia AveJun 17, 2025Electrical to gate operator · 125 m away
- 219 S Henderson AveMay 12, 20268 foot wooden fence with metal posts that cover the whole duplex · 136 m away
- 221 S Henderson AveJan 8, 2026Gas test · 137 m away
- 5207 Columbia AveMay 15, 2026Excavate a tunnel and 4 access holes and replace 154 ft of existing compromised cast iron sewer line under apartment building and approximately 30 ft through trenched through the yard fromm the building to the city sewer tie in. schedule 40 pvc pipe, properly supported from the structure · 144 m away
- 115 S St Mary AveNov 9, 2026Nsfaa new construction of a two-story single-family residence containing approximately 2418 sq ft of conditioned living area and an attached 390 sq ft two-car garage, with four bedrooms, four full bathrooms and one second-floor balconies. work includes site grading and drainage, foundation, structural framing, roofing, exterior finishes, electrical, plumbing, hvac, insulation, interior finishes, driveway, sidewalks, landscaping, and water/sewer connections · 158 m away
- 5324 Reiger AveSep 13, 2026Commercial new multi-family project consisting of 5, 4 story units with access to the roof · 173 m away
- 5321 Reiger AveJun 18, 2025Qteam meeting tbd new construction of a 4-story building containing 9 residential units · 186 m away
- 5200 East Side AveFeb 24, 2026Replace damaged meter base and riser with new meter base, pipe and wire · 186 m away