Recent · latest filing Oct 2025Residential
6122 E University Blvd
Dallas, TX 75214
Residential gas-line work permitted at 6122 E University Blvd
A residential plumbing permit for gas-line work at 6122 E University Blvd was filed on October 6, 2025. The City of Dallas record lists permit RES-PLM-25-005698 and does not provide a project value or square footage.
Summarized from City of Dallas records · updated Oct 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 6, 2025
- since Oct 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6122 E University Blvd
What is being built at 6122 E University Blvd?
A City of Dallas residential plumbing permit indicates gas-line work at the address. The record does not describe a new building.
When was the gas-line permit filed at 6122 E University Blvd?
The permit was filed on October 6, 2025.
What is the permit number for 6122 E University Blvd?
The City of Dallas permit number is RES-PLM-25-005698.
Is this a residential or commercial project?
The record classifies it as a residential plumbing permit.
How much will the gas-line work at 6122 E University Blvd cost?
The permit record does not list a reported valuation or an estimated project cost.
Also being built nearby
All of 75214- 6128 E University BlvdOct 13, 2026Replacing the main panel and updated the meter base to code · 17 m away
- 6116 E University BlvdJan 23, 2026Comp shingle roof replacement · 18 m away
- 6134 E University BlvdJul 16, 2026Install ev charger · 34 m away
- 6135 E University BlvdNov 11, 2025Gas repairs · 37 m away
- 6111 E University BlvdNov 16, 2026New gas line · 37 m away
- 6140 E University BlvdDec 2, 2020Replace or modify existing hvac · 52 m away
- 6104 E University BlvdDec 30, 2020Upgrade existing electrical service · 53 m away
- 6141 E University BlvdApr 21, 2026Re-roof (shingles only) · 53 m away
- 6146 E University BlvdMar 20, 2026Install 40 gallon gas water heater in utility room closet · 69 m away
- 6127 Annapolis LnOct 7, 2026Cut cast iron at ground level an run pvc in it place to connect toilet an shower drain · 85 m away
- 6121 Annapolis LnOct 19, 2026We excavated approximately 40 linear feet to expose and replace the existing underground copper gas line. this included approximately 15 feet of saw-cutting and excavation through the concrete driveway and 25 feet of trenching through the grass.we replaced the existing copper gas piping with new code-approved underground gas piping, properly sized and installed in accordance with applicable gas codes and utility requirements. the excavation route passed through the root system of a large existing tree, requiring portions of the tree roots to be cut and removed to complete the trench and install the new gas line.we also installed a new gas riser at the home to provide a defined transition and separation between the underground yard gas line and the existing house gas piping · 87 m away
- 6145 Annapolis LnMar 17, 2026Replacement of two (2) existing hvac systems (air conditioning condensers and gas furnaces) with new equipment in the same locations. no changes to system layout, equipment location, or ductwork are proposed. existing ductwork, electrical, and gas connections will be reused and connected to the new equipment. work includes removal and disposal of old units, installation of new units, refrigerant connections, electrical reconnection, gas reconnection, condensate drain connection, system startup, and testing for proper operation · 96 m away