6146 E University Blvd
Dallas, TX 75214
Water heater work permitted at 6146 E University Blvd
Dallas permits indicate water heater installations at 6146 E University Blvd, rather than a new building project. The latest record, dated March 20, 2026, is for installing a 40-gallon gas water heater in a utility room closet; an earlier permit dated October 23, 2020, also lists water heater installation.
Summarized from City of Dallas records · updated Mar 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 20, 2026
- since Oct 23, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 6146 E University Blvd
What is being built at 6146 E University Blvd?
The available Dallas permits indicate water heater work, not a new building. The latest permit is for installing a 40-gallon gas water heater.
Was a new building permitted at 6146 E University Blvd?
The two records provided are for water heater installation, not new construction. They are dated October 23, 2020, and March 20, 2026.
When was the latest permit filed for 6146 E University Blvd?
The latest listed permit was filed March 20, 2026. It is permit RES-PLM-26-003028 for a 40-gallon gas water heater installation.
What does permit RES-PLM-26-003028 cover?
The March 20, 2026, Dallas permit describes installing a 40-gallon gas water heater in a utility room closet.
Was there an earlier water heater permit at this address?
Yes. A Dallas plumbing permit dated October 23, 2020, lists water heater installation at 6146 E University Blvd.
Is a business or tenant opening at 6146 E University Blvd?
The records provided do not identify a business, tenant, or opening. They list water heater permits dated 2020 and 2026.
Also being built nearby
All of 75214- 6140 E University BlvdDec 2, 2020Replace or modify existing hvac · 17 m away
- 6141 E University BlvdApr 21, 2026Re-roof (shingles only) · 21 m away
- 6134 E University BlvdJul 16, 2026Install ev charger · 35 m away
- 6135 E University BlvdNov 11, 2025Gas repairs · 37 m away
- 6128 E University BlvdOct 13, 2026Replacing the main panel and updated the meter base to code · 52 m away
- 6165 E University BlvdOct 23, 2025Single family addition add duct work to addition and hvac change out · 53 m away
- 6122 E University BlvdOct 6, 2025Gas line · 69 m away
- 6116 E University BlvdJan 23, 2026Comp shingle roof replacement · 87 m away
- 6145 Annapolis LnMar 17, 2026Replacement of two (2) existing hvac systems (air conditioning condensers and gas furnaces) with new equipment in the same locations. no changes to system layout, equipment location, or ductwork are proposed. existing ductwork, electrical, and gas connections will be reused and connected to the new equipment. work includes removal and disposal of old units, installation of new units, refrigerant connections, electrical reconnection, gas reconnection, condensate drain connection, system startup, and testing for proper operation · 90 m away
- 6140 Chesley LnDec 13, 2025We will replace the 40 gal gas heater in garage closet · 99 m away
- 6128 Chesley LnAug 12, 2025Installation of three (3) steel pipe piers on exterior & polyurethane foam injetin to raise the interior slab · 101 m away
- 6111 E University BlvdNov 16, 2026New gas line · 103 m away