6226 Martel Ave
Dallas, TX 75214
Water-line replacement and roof work at 6226 Martel Ave
Permits indicate repairs to an existing home at 6226 Martel Ave, including replacement of the water line from the city meter to the house. The plumbing permit was filed October 21, 2026; a roofing permit for new shingles and underlayment was filed May 30, 2025.
Summarized from City of Dallas records · updated Oct 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 21, 2026
- since May 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace galvanized piping from city meter to home, approx. 40 foot underneath two sidewalks.replaced water line from meter to home, tied back into irrigation system and hose bib next to the house, included new whole home shut off next to house. job is ready to pull permit and call for inspection
Replace galvanized piping from city meter to home, approx. 40 foot underneath two sidewalks.replaced water line from meter to home, tied back into irrigation system and hose bib next to the house, included new whole home shut off next to house. job is ready to pull permit and call for inspection
City of Dallas permitResidential Plumbing PermitRemove all felt and replace with certainteed roof runner synthetic felt. remove all shingles and replace with certainteed architectural shingles. install new ice and water shield. install new drip edge. limited lifetime warranty
Remove all felt and replace with certainteed roof runner synthetic felt. remove all shingles and replace with certainteed architectural shingles. install new ice and water shield. install new drip edge. limited lifetime warranty
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 6226 Martel Ave
What work is permitted at 6226 Martel Ave?
City of Dallas records show a residential plumbing permit for replacing the water line from the city meter to the home and a roofing permit for replacing the roof materials.
Is a new home being built at 6226 Martel Ave?
The available permits describe repairs to an existing home, not construction of a new home.
When was the water-line permit filed for 6226 Martel Ave?
The residential plumbing permit, RES-PLM-26-011254, was filed October 21, 2026. It describes replacing galvanized piping from the city meter to the home.
What roofing work was permitted at 6226 Martel Ave?
Permit RES-ROOF-25-000167, filed May 30, 2025, describes replacing the roof felt and shingles and installing ice and water shield and new drip edge.
How many permits are on record for 6226 Martel Ave?
The City of Dallas records list two permits: one for roofing filed May 30, 2025, and one for plumbing filed October 21, 2026.
Also being built nearby
All of 75214- 6232 Martel AveMar 8, 2026Re-roof (shingles only) · 11 m away
- 6235 Martel AveMar 31, 2026Drain replacement · 19 m away
- 6219 Martel AveMay 22, 2026Install gas line to pool heater and fire pit · 19 m away
- 6211 Martel AveMay 4, 2026Mcr installation of residential roof-integrated pv solarshingle system (bipv) consisting of 100 modules - 5.7 kw dc · 31 m away
- 6245 Martel AveJan 30, 2026New residential hvac installation · 34 m away
- 6253 Martel AveMar 4, 2026Repiping sewer line to the city tap · 48 m away
- 6223 Revere PlAug 27, 2026Replace the existing 100 amp federal pacific stab-lok load center with a new 200amp service.install a new 2 inch rigid galvanized steel service mast, weatherhead, and roofflashing. install a new 200 amp ringless meter socket on the exterior wall at theheight required by oncor. install new 2/0 awg copper service entrance conductors.install a new 200 amp, 42 space, nema 3r main breaker load center on the exteriorwall. the existing load center is in an interior pantry that cannot provide therequired working clearance in front of a panel, so the new load center is installedoutdoors. the outdoor main breaker serves as the emergency disconnect.remove the existing federal pacific load center. install junction enclosures at theformer panel location and re-route 26 existing branch circuits through the attic tothe new load center.install a whole house surge protective device.install a new grounding electrode system consisting of two 5/8 inch by 8 foot groundrods, a cold water pipe bond, an intersystem bonding termination, and a #4 awg barecopper grounding electrode conductor. install insulated grounding bushings andsupply side bonding jumpers on the service raceway · 77 m away
- 6212 Revere PlJan 27, 2021Gas relay or repair with test · 84 m away
- 6226 Revere PlNov 13, 2026Install 8' fence · 96 m away
- 6281 Martel AveJul 9, 2026Replacing copper water lines in the home with pex · 96 m away
- 6285 Martel AveMay 4, 202630 years hd timberline architecture shingles including synthetic felt, z ridge, metal edge, metal valley, roof vents, jack boots, step flashing · 103 m away
- 6294 Martel AveOct 30, 2026100' 8" cedar fence backyard · 121 m away