6245 Martel Ave
Dallas, TX 75214
New home permitted after demolition at 6245 Martel Ave
A residential demolition and new-home project is recorded at 6245 Martel Ave in Dallas. The demolition permit was filed September 22, 2025, followed by a new residential construction permit on October 22, 2025. Later permits cover plumbing, electrical, HVAC and fences.
Summarized from City of Dallas records · updated Jan 30, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Jan 30, 2026
- since Sep 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 6245 Martel Ave
What is being built at 6245 Martel Ave?
City of Dallas records show a new residential construction permit for the address, filed October 22, 2025, after a demolition permit was filed September 22, 2025.
Was a house demolished at 6245 Martel Ave?
A City of Dallas demolition permit filed September 22, 2025, describes a clean-and-clear lot at 6245 Martel Ave.
When was new construction permitted at 6245 Martel Ave?
The residential new construction permit, RES-NEW-25-000903, was filed October 22, 2025.
What other permits were filed for 6245 Martel Ave?
Records include new construction plumbing, filed December 29, 2025; new electrical, filed December 17, 2025; and residential HVAC, filed January 30, 2026.
Were fences permitted at 6245 Martel Ave?
Two residential accessory structure permits describe cedar fences: one filed December 18, 2025, for a 6-foot fence and another filed January 13, 2026, for an 8-foot fence.
Also being built nearby
All of 75214- 6253 Martel AveMar 4, 2026Repiping sewer line to the city tap · 14 m away
- 6235 Martel AveMar 31, 2026Drain replacement · 18 m away
- 6232 Martel AveMar 8, 2026Re-roof (shingles only) · 25 m away
- 6226 Martel AveOct 21, 2026Replace galvanized piping from city meter to home, approx. 40 foot underneath two sidewalks.replaced water line from meter to home, tied back into irrigation system and hose bib next to the house, included new whole home shut off next to house. job is ready to pull permit and call for inspection · 34 m away
- 6219 Martel AveMay 22, 2026Install gas line to pool heater and fire pit · 46 m away
- 6211 Martel AveMay 4, 2026Mcr installation of residential roof-integrated pv solarshingle system (bipv) consisting of 100 modules - 5.7 kw dc · 60 m away
- 6281 Martel AveJul 9, 2026Replacing copper water lines in the home with pex · 64 m away
- 6285 Martel AveMay 4, 202630 years hd timberline architecture shingles including synthetic felt, z ridge, metal edge, metal valley, roof vents, jack boots, step flashing · 71 m away
- 6223 Revere PlAug 27, 2026Replace the existing 100 amp federal pacific stab-lok load center with a new 200amp service.install a new 2 inch rigid galvanized steel service mast, weatherhead, and roofflashing. install a new 200 amp ringless meter socket on the exterior wall at theheight required by oncor. install new 2/0 awg copper service entrance conductors.install a new 200 amp, 42 space, nema 3r main breaker load center on the exteriorwall. the existing load center is in an interior pantry that cannot provide therequired working clearance in front of a panel, so the new load center is installedoutdoors. the outdoor main breaker serves as the emergency disconnect.remove the existing federal pacific load center. install junction enclosures at theformer panel location and re-route 26 existing branch circuits through the attic tothe new load center.install a whole house surge protective device.install a new grounding electrode system consisting of two 5/8 inch by 8 foot groundrods, a cold water pipe bond, an intersystem bonding termination, and a #4 awg barecopper grounding electrode conductor. install insulated grounding bushings andsupply side bonding jumpers on the service raceway · 84 m away
- 6294 Martel AveOct 30, 2026100' 8" cedar fence backyard · 90 m away
- 6226 Revere PlNov 13, 2026Install 8' fence · 98 m away
- 6212 Revere PlJan 27, 2021Gas relay or repair with test · 104 m away