7169 Dalewood Ln
Dallas, TX 75214
Permits cover a 24 kW generator at a Dallas home
City of Dallas permits indicate a 24 kW generator, transfer switch and natural gas connections are planned at 7169 Dalewood Ln. The electrical permit was filed October 23, 2026, followed by a plumbing permit for the gas line on November 11, 2026.
Summarized from City of Dallas records · updated Nov 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 11, 2026
- since Oct 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7169 Dalewood Ln
What is being installed at 7169 Dalewood Ln?
City of Dallas permits describe installation of a 24 kW generator, a 200-amp automatic transfer switch and natural gas connections. A separate permit covers running the gas line to the generator.
When were permits filed for the generator at 7169 Dalewood Ln?
The electrical permit, RES-ELC-26-006613, was filed October 23, 2026. The plumbing permit, RES-PLM-26-012223, was filed November 11, 2026.
Is a generator being added at 7169 Dalewood Ln in Dallas?
Yes. A City of Dallas electrical permit describes installation of a 24 kW generator with a 200-amp automatic transfer switch and natural gas connections.
What does permit RES-ELC-26-006613 cover?
Filed October 23, 2026, the residential electrical permit describes installing a 24 kW generator, a 200-amp automatic transfer switch and natural gas connections at 7169 Dalewood Ln.
What does permit RES-PLM-26-012223 cover?
Filed November 11, 2026, the residential plumbing permit covers running a gas line to the generator at 7169 Dalewood Ln.
Also being built nearby
All of 75214- 7165 Dalewood LnJun 11, 2026Remove and replace roof · 11 m away
- 7166 Dalewood LnFeb 4, 2026Dismantle and removal of existing 6ft privcay fence and replace with 8ft board on board privacy · 14 m away
- 7172 Dalewood LnAug 14, 2025Replacing one 3 ton system · 15 m away
- 7158 Dalewood LnAug 17, 20268 1/2' wood fence on steel posts · 29 m away
- 7152 Dalewood LnOct 6, 2026Nsfaa residential new construction***does not need water review, refer to related record, ww record was already created under res-new-26-000063 · 43 m away
- 7148 Dalewood LnJul 25, 2025Install 50 gal gas water heater in closet · 53 m away
- 7202 Dalewood LnNov 5, 2026After noticing water bubbling up in his yard, it was determined the homeowner had a leak at his whole home shut off valve. we are replacing 39 ft of water line from the meter to the house and the valve · 88 m away
- 7207 Dalewood LnNov 17, 2026Nsfaa 7207 dalewood ln, nsfd · 98 m away
- 7129 Dalewood LnDec 15, 2025Replace existing hvac unit · 103 m away
- 7157 Westbrook LnSep 4, 2025Replace the existing cast-iron sewer lines for the hall bath toilet and tub with pvc“ · 111 m away
- 7128 Westbrook LnJan 19, 2026Remove old composition shingles & install new composition shingles · 127 m away
- 7114 Dalewood LnJul 17, 20253-ton trane level 1 complete system replacement · 130 m away