7202 Dalewood Ln
Dallas, TX 75214
Water line replacement permitted at 7202 Dalewood Ln
A residential plumbing permit filed November 5, 2026, covers replacing 39 feet of water line from the meter to the house and replacing the whole-home shutoff valve. The City of Dallas record identifies a leak at the valve; it does not describe new construction.
Summarized from City of Dallas records · updated Nov 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2026
- since Nov 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectAfter noticing water bubbling up in his yard, it was determined the homeowner had a leak at his whole home shut off valve. we are replacing 39 ft of water line from the meter to the house and the valve
After noticing water bubbling up in his yard, it was determined the homeowner had a leak at his whole home shut off valve. we are replacing 39 ft of water line from the meter to the house and the valve
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 7202 Dalewood Ln
What is being built at 7202 Dalewood Ln?
The City of Dallas permit describes a water line and shutoff valve replacement, not a new building. It covers 39 feet of line from the meter to the house.
What work is planned at 7202 Dalewood Ln in Dallas?
A residential plumbing permit covers replacing the whole-home shutoff valve and 39 feet of water line. It was filed November 5, 2026.
When was the plumbing permit filed for 7202 Dalewood Ln?
The City of Dallas filed permit RES-PLM-26-011992 on November 5, 2026.
Why is the water line being replaced at 7202 Dalewood Ln?
The permit description says water was bubbling up in the yard and a leak was identified at the whole-home shutoff valve.
How much water line is being replaced at 7202 Dalewood Ln?
The permit describes replacing 39 feet of water line between the meter and the house, along with the shutoff valve.
Also being built nearby
All of 75214- 7207 Dalewood LnNov 17, 2026Nsfaa 7207 dalewood ln, nsfd · 16 m away
- 7230 Dalewood LnJul 20, 20267230 dalewood install 3 concrete pilings to stabilize foundation · 71 m away
- 7172 Dalewood LnAug 14, 2025Replacing one 3 ton system · 75 m away
- 7169 Dalewood LnNov 11, 2026Run gas line to generator · 88 m away
- 7166 Dalewood LnFeb 4, 2026Dismantle and removal of existing 6ft privcay fence and replace with 8ft board on board privacy · 88 m away
- 7165 Dalewood LnJun 11, 2026Remove and replace roof · 98 m away
- 7157 Westbrook LnSep 4, 2025Replace the existing cast-iron sewer lines for the hall bath toilet and tub with pvc“ · 98 m away
- 7158 Dalewood LnAug 17, 20268 1/2' wood fence on steel posts · 105 m away
- 7202 Westbrook LnMar 20, 2026Removing old and installing a new 8’ tall cedar fence, 186 lf, 1 pedestrian gate, metal posts · 116 m away
- 7152 Dalewood LnOct 6, 2026Nsfaa residential new construction***does not need water review, refer to related record, ww record was already created under res-new-26-000063 · 119 m away
- 7148 Dalewood LnJul 25, 2025Install 50 gal gas water heater in closet · 129 m away
- 7227 Westbrook LnJun 29, 2026Install 5 ton (gas) a/c system with duct work · 137 m away